On the map
State significant development

Stratford Pumped Hydro and Solar

Withdrawn: withdrawnEnergy: batteriesDistrict scale

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Development of a 300 MW / 3600 MWh pumped hydro energy storage and generation project, 330 MW solar farm, grid connection and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

18 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1

See the document on the Planning Portal

SEARs17

See the 17 documents on the Planning Portal

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.