Road 1 Data Centre
A 34.3 MW data centre at 1-5 Khartoum Road, Macquarie Park
Where it is in the process
Approved on 1 Oct 2026
What it proposes
AI summary. Written from this project's page and its Signed - SSD Determination Instrument and Signed - SSD-SSI Assessment Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 34.3 MW data centre at 1-5 Khartoum Road, Macquarie Park
The project is a ten-storey data centre at 1-5 Khartoum Road, Macquarie Park, in the City of Ryde, with a power capacity of 34.3 MW and a maximum building height of 73.4 m. It would operate 24 hours a day on a site of 8,096 m², and includes back-up generators, cooling plant, diesel and battery storage, part of two new roads, landscaping and earthworks. The estimated cost is $630,439,030. The consent caps total power use at 49 megawatts.
The environmental impact statement was exhibited from 11 Sep 2025 to 8 Oct 2025 and drew 7 submissions: 3 objecting, 1 supporting and 3 commenting. The department found the project approvable subject to conditions. A director of the department, as the Minister's delegate, approved it on 1 Oct 2026. Next, the proponent must meet the conditions, including noise and air quality management plans, before and during construction.
- Estimated development cost
- $630.4MSigned - SSD-SSI Assessment Report
- Power capacity (IT load)
- 34.3 MWPortal page
- Maximum building height
- 73.4 mPortal page
- Site area
- 8,096 m²Signed - SSD-SSI Assessment Report
- Gross floor area
- 13,307 m²Signed - SSD-SSI Assessment Report
- Trees to be planted
- 36 treesSigned - SSD-SSI Assessment Report
The department's description
Construction and operation of a data centre with a power capacity of 34.3 MW and maximum building height of 73.4 m (10 Storeys) including plant and equipment, part road construction, car parking, landscaping and public domain works.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
7 submissions: 5 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
74 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS40
- Appendix A SEARs Compliance Table
- Appendix AA Heritage Impact Assessment
- Appendix B Statutory Compliance Table
- Appendix BB Flood Risk Assessment
- Appendix C Engagement Summary Table
- Appendix CC ESD Report
- Appendix D Mitigation Measures Table
- Appendix DD Hazards and Risk Report
- Appendix E Architectural Plans
- Appendix EE Survey Plan
- Appendix F Architectural Design Report
- Appendix FF Visual Impact Assessment
- Appendix GG Environmental Wind Assessment
- Appendix H Landscape Plans
- Appendix HH Greenhouse Gas Assessment
- Appendix I Landscape Design Report
- Appendix II Public Domain and Civil Engineering Plans
- Appendix J Air Quality Impact Assessment
- Appendix JJ Preliminary Construction Management Plan
- Appendix K Noise and Vibration Impact Assessment
- Appendix KK Groundwater Impact Assessment
- Appendix L Infrastructure Requirements Report
- Appendix M Social Impact Assessment
- Appendix N Detailed Site Investigation
- Appendix O Geotechnical Report
- Appendix P Arboricultural Impact Assessment
- Appendix Q BCA Compliance Report
- Appendix R Accessibility DDA Compliance Report
- Appendix S Transport and Access Impact Assessment
- Appendix T Operational Waste Management Plan
- Appendix U ConstructionWaste Management Plan
- Appendix V Water Management Plan
- Appendix Vv DRAINS Model
- Appendix W ACHAR_Redcated
- Appendix X Draft Letter of Offer
- Appendix Y BDAR Waiver Determination Letter
- Appendix Z Engagement Outcomes Report
- Application_20250828055117
- EIS_Road 1 Data Centre_Final
- NABERS Embodied emissions materials form
Response to Submissions10
- Attachment A Cross Sectional Drawing_ASK144
- Attachment B Revised Architectural Design Report
- Attachment C Swept Path Diagrams
- Attachment D Revised Landscape Design Report
- Attachment E_ Revised ESD Report
- Attachment F_Revised Letter of Offer
- Attachment G_ Revised Air Quality Report
- Attachment H Signage and Linemarking Diagram
- MPark Road 1 Data Centre_Response to Submissions Report
- Request for Submissions Report
Agency Advice11
- Attachment 1 _RtS Response 1-5 Khartoum Rd Blg H
- CPHR Advice Letter - Road 1 Data Centre (SSD-80814238)
- CoR Cover letter - 1-5 Khartoum Road
- CoR EIS Submission - 1-5 Khartoum Rd - Final
- CoR Submission Cover Letter - 1-5 Khartoum Road H
- EPA response to EIS - 1 Data Centre
- EPA response to Submissions
- FRNSW - EIS - Road 1 Data Centre
- Road 1 Data Centre (SSD-80814238)
- SWC Response - SSD-80814238 signed
- TfNSW Response for SSD-80814238 - EIS
Additional Information3
What's near it
Where it is
- Suburb
- Macquarie Park
- Council area
- Ryde
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.