A 34.3 MW data centre at 1-5 Khartoum Road, Macquarie Park

Decided: approved on 1 Oct 2026Data centresDistrict scale

Where it is in the process

Approved on 1 Oct 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination1 Oct 2026 (done)
  9. Approved1 Oct 2026

What it proposes

AI summary. Written from this project's page and its Signed - SSD Determination Instrument and Signed - SSD-SSI Assessment Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 34.3 MW data centre at 1-5 Khartoum Road, Macquarie Park

The project is a ten-storey data centre at 1-5 Khartoum Road, Macquarie Park, in the City of Ryde, with a power capacity of 34.3 MW and a maximum building height of 73.4 m. It would operate 24 hours a day on a site of 8,096 m², and includes back-up generators, cooling plant, diesel and battery storage, part of two new roads, landscaping and earthworks. The estimated cost is $630,439,030. The consent caps total power use at 49 megawatts.

The environmental impact statement was exhibited from 11 Sep 2025 to 8 Oct 2025 and drew 7 submissions: 3 objecting, 1 supporting and 3 commenting. The department found the project approvable subject to conditions. A director of the department, as the Minister's delegate, approved it on 1 Oct 2026. Next, the proponent must meet the conditions, including noise and air quality management plans, before and during construction.

Estimated development cost
$630.4MSigned - SSD-SSI Assessment Report
Power capacity (IT load)
34.3 MWPortal page
Maximum building height
73.4 mPortal page
Site area
8,096 m²Signed - SSD-SSI Assessment Report
Gross floor area
13,307 m²Signed - SSD-SSI Assessment Report
Trees to be planted
36 treesSigned - SSD-SSI Assessment Report

The department's description

Construction and operation of a data centre with a power capacity of 34.3 MW and maximum building height of 73.4 m (10 Storeys) including plant and equipment, part road construction, car parking, landscaping and public domain works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

7 submissions: 5 from the public, 1 from organisations and 1 from public authorities

Object3
Support1
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

74 documents in 9 folders, each on the NSW Planning Portal

Early Consultation2
Notice of Exhibition1
Request for SEARs2
SEARs2
EIS40
Response to Submissions10
Agency Advice11
Additional Information3
Determination3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.