1-5 Khartoum Road Data Centre
A 76.4 MW data centre on Khartoum Road, Macquarie Park
Where it is in the process
Approved on 11 Mar 2026
What it proposes
AI summary. Written from this project's page and its SSD Assessment Report and Signed - SSD Determination Instrument on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 76.4 MW data centre on Khartoum Road, Macquarie Park
The project is a data centre at 1-5 Khartoum Road, Macquarie Park, in the City of Ryde. The assessment report describes a 76.4 MW facility with a gross floor area of 19,434 m², up to 45 m high, with backup generators, cooling plant and diesel and battery storage. It would replace an existing car park, removing 64 trees. The estimated cost of development is $718,259,656. Construction would take 33 months.
The environmental impact statement was exhibited from 6 Mar 2025 to 2 Apr 2025 and drew 4 submissions: 3 objecting and 1 commenting. The department's assessment focused on noise, air quality and design, and found the project approvable with conditions. A director of the department, acting as the Minister's delegate, approved it on 11 Mar 2026. Next, the applicant must meet the conditions, including noise and air quality management plans, before and during construction.
- Estimated development cost
- $718.3MSSD Assessment Report
- Power capacity
- 76.4 MWSSD Assessment Report
- Gross floor area
- 19,434 m²SSD Assessment Report
- Maximum building height
- 45 mPortal page
- Trees to be removed
- 64 treesSSD Assessment Report
- Construction period
- 33 monthsSSD Assessment Report
- Public submissions
- 4 submissionsPortal page
The department's description
Construction and operation of a 5 storey data centre with a building height of 45 m and a capacity of 35 MW, diesel storage, part road construction, landscaping, carparking and associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
4 submissions: 2 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
98 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS34
- Appendix A - SEARs Compliance Table
- Appendix AA - Heritage Impact Statement
- Appendix B - Statutory Compliance Table
- Appendix BB - Flood Impact Risk Assessment
- Appendix C - Community Engagement Summary Table
- Appendix CC - ESD Report
- Appendix D - Mitigation Measures Table
- Appendix DD - Hazards and Risk Report
- Appendix E - Architectural Plans
- Appendix EE - Site Survey
- Appendix F - Architectural Design Report
- Appendix FF- Visual Impact Assessment
- Appendix GG - Environmental Wind Assessment Report
- Appendix H - Landscape Plans
- Appendix HH - Greenhouse Gas and NABERS
- Appendix I - Landscape Design Report
- Appendix J - Air Quality Impact Assessment
- Appendix K - Noise and Vibration Impact Assessment
- Appendix L - Infrastructure Requirement and Utilities Repor
- Appendix M - Social Impact Assessment
- Appendix N - Detailed Site Investigation
- Appendix O - Geotechnical Investigation
- Appendix P - Arboricultural Impact Assessment
- Appendix Q - BCA Compliance Report
- Appendix R - DDA Accessibility Report
- Appendix S - Transport and Accessibility Impact Assessment
- Appendix T - Operational Waste Management Plan
- Appendix U - CWDMP
- Appendix V - Water Management Plan
- Appendix W - ACHAR_Redacted
- Appendix X - Draft Letter of Offer
- Appendix Y - BDAR Waiver Determination - SSD-63235720
- Appendix Z - Community Engagement Outcomes Report
- Environmental Impact Statement
Response to Submissions14
- Additional Matters for Submissions Report Letter
- Appendix A - Revised Mitigation Measures Table
- Appendix B - Revised Statutory Compliance Table
- Appendix C - Revised Architectural Plans
- Appendix D - Revised Transport and Impact Assessment
- Appendix E - Revised Noise and Vibration Impact Assessment
- Appendix F - Northrop Flood Responses Letter
- Appendix G - Preliminary Construction Management Plan
- Appendix H - Clause 4.6 Request
- Appendix I - Revised ESD Report
- Appendix J - Indicative Site Wide Landscape Masterplan
- Appendix K - Revised Water Management Plan
- Initial Department Request RTS Letter 03.04.25
- Response to Submissions Report
Agency Advice23
- 1-5 Khartoum Road Data Centre (SSD-63235720)
- 20250522 - TfNSW response
- Addendum RTS Submission 1-5 Khartoum Road
- Assessment - EPA Response
- Assessment - Ryde Council Response - Attachment 1
- Assessment - Ryde Council Response - Cover Letter
- Attachment 1 -1-5 Khartoum Road Macquarie Park
- COR RTS Cover Letter - 1-5 Khartoum Road
- CPHR Comments on Add Info for 1-5 Khartoum Rd Data Centre
- CPHR Comments on EIS for 1-5 Khartoum Road Data Centre
- CPHR Comments on RtS 1-5 Khartoum Road Data Centre
- Council EIS Response Attachment 1 01.04.25
- Council EIS Response Attachment 2 01.04.25
- Council EIS Response Letter 01.04.25
- EIS Khartoum Rd Data Centre, Macquarie Park (SSD-6325720)
- EPA EIS response 02.04.25
- EPA response to submissions report
- Fire & Rescue NSW EIS response 17.03.25
- HNSW ACH - RtS - 1-5 Khartoum Road - SSD-63235720
- HNSW ACH EIS Response 27.03.25
- HeritageNSW_EH_EIS_SSD-63235720_HMS 9438
- Letter Out - DPHI Response RTS - No Further Comment
- TfNSW EIS Response 21.03.25
Additional Information19
- Attachment A - Legal Advice
- Attachment B - Flood Response Letter
- Attachment C - Arup Summary Advice on CFD Modelling
- Final Addendum RTS Submission 1-5 Khartoum Road_220725
- Legal Advice
- MPARK2_ARR2016_no OSD_y5r
- MPARK2_ARR2016_with OSD_100yr_With Ex Pit
- Request for Additional Information
- Request for Additional Information
- Request for Additional Information
- Request for Additional Information
- Request for Additional Information 2
- Response to Council RFI
- Response to RFI - Oct 2025
- Response to RFI_CFD_17Dec2025 FINAL 2
- Response to additional RFI_SSDA_63235720
- Revised Flood Report
- Updated Ground Floor Plan
- Updated Water Mangement Plan
What's near it
Where it is
- Suburb
- Macquarie Park
- Council area
- Ryde
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.