Resource Recovery Facility Met Recycling - HEZ
A 550,000 tonne a year resource recovery facility, Cessnock
Where it is in the process
At sears
What it proposes
AI summary. Written from this project's page and its CC200039_SEARs Request Scoping Study 2021 v4 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 550,000 tonne a year resource recovery facility, Cessnock
The proponent proposes a resource recovery facility with an annual processing capacity of 550,000 tonnes, on about 10 ha of Lot 2, DP 1142708 in the Hunter Economic Zone, in the Cessnock City area. It would sort, crush, wash and recycle construction and demolition waste into products for sale. Works include two recycling sheds of about 10,000 m² and 4,000 m², each up to 15 m high, and a car park for about 52 cars. It is expected to create 90-100 construction jobs and 30 to 50 operational jobs, and would run 24 hours a day, 7 days a week. No capital investment is stated.
The case is at the stage of preparing the Secretary's environmental assessment requirements (SEARs). The proponent's scoping study, dated January 2022, has been lodged to request them. Next, the SEARs are issued, and the proponent prepares an environmental impact statement (EIS) for public exhibition. No submissions have been made yet.
- Processing capacity
- 550,000 tonnes a yearCC200039_SEARs Request Scoping Study 2021 v4
- Site area
- 10 haCC200039_SEARs Request Scoping Study 2021 v4
- Shed 1 floor area
- 10,000 m²CC200039_SEARs Request Scoping Study 2021 v4
- Shed 2 floor area
- 4,000 m²CC200039_SEARs Request Scoping Study 2021 v4
- Maximum shed height
- 15 mCC200039_SEARs Request Scoping Study 2021 v4
- Car spaces
- 52 car spacesCC200039_SEARs Request Scoping Study 2021 v4
- Construction jobs (upper end)
- 100 jobsCC200039_SEARs Request Scoping Study 2021 v4
- Operational jobs (upper end)
- 50 jobsCC200039_SEARs Request Scoping Study 2021 v4
The department's description
Resource Recovery Facility with a processing capacity of 550,000 tonnes per annum
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
1 document in 1 folder, each on the NSW Planning Portal
Request for SEARs1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.