Kurri Kurri Battery Energy Storage System

A 200 MW battery at 28 Johnson Avenue, Kurri Kurri

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 200 MW battery at 28 Johnson Avenue, Kurri Kurri

Ausgrid proposes a battery energy storage system of up to 200 MW and up to 800 MWh at 28 Johnson Avenue, Kurri Kurri, in the Cessnock City Council area, about 30 km north-west of Newcastle. It would sit on a site of about 1.3 ha next to the existing Kurri Kurri Zone Substation, and connect to it by 33 kV underground cables. It would include containerised battery units, a switch and control room, a warehouse, an operation and maintenance building and a backup diesel generator. No capital investment or job numbers are stated.

The proponent lodged a scoping report dated 30 Mar 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Battery power capacity
200 MWScoping Report
Battery storage capacity
800 MWhScoping Report
Site area
1.3 haScoping Report

The department's description

Development of a 200 MW / 800 MWh battery energy storage facility with associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.