Kurri Kurri Integrated Resource Recovery Centre

Expanding the Kurri Kurri resource recovery centre to 450,000 tpa

Decided: approved on 28 Aug 2026WasteNeighbourhood scale

Where it is in the process

Approved on 28 Aug 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination28 Aug 2026 (done)
  9. Approved28 Aug 2026

What it proposes

AI summary. Written from this project's page and its SSD Assessment Report and SSD Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Expanding the Kurri Kurri resource recovery centre to 450,000 tpa

The project expands an existing resource recovery facility at 8 Styles Street, Kurri Kurri, in the Cessnock City area. It would process up to 450,000 tonnes a year of non-putrescible general solid waste, up from 90,000 now, and store up to 40,000 tonnes on site at any one time. It would run 24 hours a day, 7 days a week, on a site of 4.2 ha. The estimated cost is $51,876,730, with 15 construction jobs and operational jobs rising from 65 to 74.

The environmental impact statement was exhibited from 13 Nov 2025 to 10 Dec 2025 and drew 7 submissions: 6 objecting and 1 supporting. The department's assessment recommended approval, and a director of the department, acting for the Minister, approved it on 28 Aug 2026, with conditions. Next, the proponent must meet those conditions before and during construction, which is planned in five stages over 17 months.

Capital investment
$51.9MSSD Assessment Report
Annual waste processing limit
450,000 tonnes a yearSSD Assessment Report
Existing annual waste processing
90,000 tonnes a yearSSD Assessment Report
Maximum waste stored on site
40,000 tonnesSSD Assessment Report
Site area
4.2 haSSD Assessment Report
Construction jobs
15 jobsSSD Assessment Report
Operational jobs after expansion
74 jobsSSD Assessment Report

The department's description

Expansion of an existing resource recovery facility to process up to 450,000 tonnes per annum (tpa) of General Solid Waste (non-putrescible), storage of up to 40,000 tpa of waste material and 24 hours 7 day operations.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

7 submissions: 7 from the public

Object6
Support1
Comment0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

64 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs2
SEARs1
EIS24
Response to Submissions2
Agency Advice27
Additional Information4
Determination3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.