Where it is in the process

Approved on 5 Jun 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination5 Jun 2026 (done)
  9. Approved5 Jun 2026

What it proposes

AI summary. Written from this project's page and its SSD-81300458 Assessment Report and SSD-81300458 Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Two apartment buildings with 124 homes at Thomas Street, Parramatta

The project is two residential flat buildings, one 8 storeys and one 9 storeys, at 85-91 Thomas Street, Parramatta, in the City of Parramatta area. They would hold 124 dwellings, including 8 affordable housing units, over basement parking with 177 car spaces. The estimated development cost is $79,014,191. The department expects 522 construction jobs and 10 operational jobs. A concurrent rezoning allows a height of 30 m.

The environmental impact statement (EIS) was exhibited from 29 Jul 2025 to 25 Aug 2025 and drew 45 submissions: 32 objecting, 10 supporting and 3 commenting. The proponent lodged a submissions report on 21 Oct 2025. The department recommended approval, and an Executive Director approved the project on 5 Jun 2026 as the Minister's delegate, with conditions. Next, the proponent must meet the conditions before building starts.

Estimated development cost
$79MSSD-81300458 Assessment Report
Dwellings
124 dwellingsPortal page
Affordable housing units
8 dwellingsPortal page
Car parking spaces
177 car spacesPortal page
Construction jobs
522 jobsSSD-81300458 Assessment Report
Operational jobs
10 jobsSSD-81300458 Assessment Report
Maximum building height
30 mSSD-81300458 Assessment Report

The department's description

Construction of one 8-storey and one 9-storey comprising:

• a total of 124 dwellings, including 8 affordable housing units

• three levels of basement carpark with 177 parking spaces

The application includes a concurrent rezoning.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

45 submissions: 42 from the public, 2 from organisations and 1 from public authorities

Object32
Support10
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

77 documents in 11 folders, each on the NSW Planning Portal

Early Consultation1
Notice of Exhibition1
Request for SEARs2
SEARs3
EIS35
Response to Submissions11
Agency Advice5
Additional Information7
Determination7
Management Plans and Strategies2
Other Documents3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.