On the map
State significant development

Residential Flat Building with Infill Affordable Housing at 17-25 Ashburner St, Manly

An eight-storey, 37-apartment building at Ashburner St, Manly

Under way: at prepare eisHomesLocal scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report_SEARs Request on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An eight-storey, 37-apartment building at Ashburner St, Manly

The proponent proposes to demolish the existing buildings at 17-25 Ashburner Street, Manly, in the Northern Beaches Council area, and join the lots into one site of 1,932 m². It would build an eight-storey residential building up to 28.6 m high with 37 apartments, 9 of them affordable housing, and two basement levels with about 76 car spaces. The scoping report gives an estimated development cost of $71.6 million at the time of a council application, and says the cost has since increased.

The case is at the stage of preparing an environmental impact statement (EIS). The scoping report to request the Secretary's environmental assessment requirements (SEARs) is dated 10 September 2026, and the SEARs have been issued. No submissions have been made yet. Next, the proponent prepares the EIS, which is then exhibited so the public can make submissions. The department assesses the project and decides it.

Apartments
37 dwellingsScoping Report_SEARs Request
Affordable apartments
9 dwellingsScoping Report_SEARs Request
Building height
28.6 mScoping Report_SEARs Request
Building storeys
8 storeysScoping Report_SEARs Request
Site area
1,932 m²Scoping Report_SEARs Request
Estimated development cost at council lodgement
$71.6MScoping Report_SEARs Request

The department's description

Demotion of all existing structures, construction of an eight-storey residential flat building (RFB), and lot consolidation. The RFB comprises 37 apartments with 9 affordable housing; two levels of basement car parking.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

3 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs2
SEARs1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.