On the map
Part 3A project

Australian Institute of Police Management

Redevelopment of the Australian Institute of Police Management

Decided: approved on 20 Mar 2009EducationLocal scale

Where it is in the process

Approved on 20 Mar 2009

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination20 Mar 2009 (done)
  10. Approved20 Mar 2009

What it proposes

AI summary. Written from this project's page and its Director General's Assessment Report.pdf and Instrument of Approval.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Redevelopment of the Australian Institute of Police Management

The Australian Federal Police proposed redeveloping the Australian Institute of Police Management, a police training site on Collins Beach Road, North Head, Manly, in the Northern Beaches area. The estimated capital investment is $21 million. The amended scheme would demolish dormitory blocks and offices and build two two-storey visitor accommodation buildings, a library extension and a new administration building. Visitor beds would rise from 30 to 54, with 34 car spaces.

The proposal was exhibited from 12 Dec 2007 to 15 Feb 2008 and drew 51 public submissions and 6 from agencies. The proponent amended it in a report received on 19 Dec 2008, moving new buildings away from the northern edge of the site, which is penguin and bandicoot habitat. The department recommended approval, and the Minister approved it on 20 Mar 2009 under the former Part 3A process. Next, the proponent must meet the approval's conditions.

Capital investment
$21MDirector General's Assessment Report.pdf
Visitor beds after redevelopment
54 bedsDirector General's Assessment Report.pdf
Car parking spaces
34 car spacesDirector General's Assessment Report.pdf
Public submissions on exhibition
51 submissionsDirector General's Assessment Report.pdf

The portal gives no description.

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Mod 1 - Design ChangesMP07_0091-Mod-1

Decided: approved on 23 Dec 2009 by the department (executive director)

Its 3 documents

3 documents in 2 folders, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

Determination1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

70 documents in 5 folders, each on the NSW Planning Portal

Application8
Request for DGRS1
EA2
Response to Submissions54
Determination5

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.