On the map
State significant development

Residential Development with In-fill Affordable Housing - 46-50 Cowan Road, St Ives

Two 9-storey buildings with 150 apartments, Cowan Road, St Ives

Under way: at prepare eisHomesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report_St Ives on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Two 9-storey buildings with 150 apartments, Cowan Road, St Ives

The proponent proposes two residential flat buildings, each about nine storeys, at 46-50 Cowan Road, St Ives, in the Ku-ring-gai Council area. The portal describes 150 apartments, including 31 affordable units, with basement car parking and landscaping. The scoping report gives an estimated development cost of about $115,000,000 and a height of about 28.6 m on a site of 5,904 m². It says about 30 apartments would be affordable.

The proponent lodged a scoping report dated 3 Jul 2026 and asked the department for the Secretary's environmental assessment requirements (SEARs). Industry-specific SEARs have been issued. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and the Minister, under delegation, decides it.

Apartments
150 dwellingsPortal page
Affordable units
31 dwellingsPortal page
Estimated development cost
$115MScoping Report_St Ives
Building height
28.6 mScoping Report_St Ives
Site area
5,904 m²Scoping Report_St Ives

The department's description

Construction of 2x 9-storey residential flat buildings comprising 150 residential apartments, including 31 affordable units, basement car parking and landscaping works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

3 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs2
SEARs1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.