Parramatta Riverside Theatres Redevelopment
Redevelopment of Riverside Theatres, Church Street, Parramatta
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its G- Architecture and Public Domain Report- 1 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Redevelopment of Riverside Theatres, Church Street, Parramatta
The proposal would redevelop Riverside Theatres at 351-353 Church Street, Parramatta, in the City of Parramatta. It would keep the existing 761-seat Riverside (Playhouse) Theatre and demolish the other buildings on the site. It would add a 1,500 seat Lyric Theatre, a 324 seat Studio Theatre and a 100 seat cinema and rehearsal space. It also includes new foyers and bars, a loading dock from Market Street, a riverfront café and landscaping along the Parramatta River. The design report says the cost is more than $30 million, but no exact capital investment is stated.
The environmental impact statement (EIS) was exhibited and drew 8 submissions: 3 in support and 5 comments. The proponent has since lodged a submissions and amendment report with amended plans. The case is now at the stage of preparing an amendment report. Next, the department assesses the project and then decides it. No decision date is stated.
- Existing Playhouse theatre seats (retained)
- 761 seatsG- Architecture and Public Domain Report- 1
- Lyric Theatre seats
- 1,500 seatsG- Architecture and Public Domain Report- 1
- Studio Theatre seats
- 324 seatsG- Architecture and Public Domain Report- 1
- Cinema and rehearsal space seats
- 100 seatsG- Architecture and Public Domain Report- 1
The department's description
Redevelopment of Riverside Theatres, including: refurbishment of the existing Drama (Riverside) theatre; new 1510 seat Lyric Theatre, 330 seat studio & 116 seat cinema; new front & back of house spaces, loading dock, landscaping & public domain works
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
8 submissions: 5 from the public and 3 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
98 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
EIS45
- A- SEARs Table
- AA- RAP
- B- Architectural Drawings- 1
- B- Architectural Drawings- 2
- BB- Acid Sulfate Soils
- C- Statutory Compliance Table
- CC- HAZMAT
- D- Mitigation Measures
- DD- Waste Management Plan
- E- Consultation Outcomes Report
- EE- ESD Report
- EIS
- F- EDC Report
- FF- NABERS Form
- G- Architecture and Public Domain Report- 1
- G- Architecture and Public Domain Report- 2
- G- Architecture and Public Domain Report- 3
- GG- Reflectivity
- H- Landscape Drawings- 2
- H- Landscape Drawings-1
- HH- Heritage Impact Statement
- I- Site Survey
- II- Historical Archaeological Assessment
- J- Design Integrity Report
- JJ- ACHAR (Redacted)
- K- Transport Impact Assessment Final
- KK-Infrastructure Delivery Report
- L-- Flood Impact Assessment
- LL- SIA
- M- Structural Statement
- MM- Clause 4.6 Active Frontages
- N- BCA Report
- NN - Clause 4.6 Overshadowing
- O- Access Report
- P- Visual Impact Assessment
- Q- CPTED
- R- Environmental Wind
- S- Noise and Vibration Impact Assessment
- T- Preliminary CMP.
- U- Arboricultural Impact Assessment
- V- BDAR Waiver
- W- Geotechnical Report
- X- Water Management Report
- Y- Fire Engineering
- Z- DSI
Response to Submissions24
- A. Submissions Register
- B. Amended Mitigation Measures
- C. Detailed Summary of Submissions
- D. Amended Architectural Drawings-1
- D. Amended Architectural Drawings-2
- E. Addendum Arch and Landscape Statement
- F. Amended Landscape Drawings-1
- F. Amended Landscape Drawings-2
- G. Amended Heritage Impact Statement
- H. Amended Historical Archaeological Assessment
- I. Amended ACHAR
- J. Flood Impact Assessment-1
- J. Flood Impact Assessment-2
- K. Wind Statement
- L. Updated Loading Dock Swept Paths
- M. Consultation Outcomes Report
- N. Design Integrity Responses
- O. Signage Design Statement
- P. Clause 4.6 Overshadowing
- Q. Noise Statement
- R. Vibration Statement
- S. Groundwater Statement
- Submissions and Amendment Report
- T. Revised Structural Statement
Agency Advice19
- CPHR EIS Advice
- CPHR RFI Advice
- CPHR RTS Advice
- EPA EIS Advice
- FRNSW EIS Advice
- HNSW ACH EIS Advice
- HNSW ACH RFI Advice
- HNSW EH EIS Advice
- HNSW EH RFI Advice
- Heritage NSW ACH RTS Advice
- Heritage NSW EH RTS Advice
- NSW DCCEEW Water Group EIS Advice
- NSW DCCEEW Water Group RTS Advice
- NSW Police EIS Advice
- NSW SES EIS Advice
- NSW SES RTS Advice
- Office of 24 hour Economy Commissioner EIS Advice
- Sydney Water EIS Advice
- TfNSW EIS Advice
What's near it
Where it is
- Suburb
- Parramatta
- Council area
- Parramatta
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.