On the map
State significant development

Mixed Use Development at 60 Phillip Street Parramatta

A 67-storey mixed-use tower at 60 Phillip Street, Parramatta

Under way: at prepare eisHomesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report 60 Phillip Street Parramatta on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 67-storey mixed-use tower at 60 Phillip Street, Parramatta

The proponent proposes a 67-storey mixed-use tower at 60 Phillip Street, Parramatta, in the City of Parramatta, on a site of about 1,577 m². The concept has approximately 371 dwellings, 15% of them affordable housing, with ground-floor retail and commercial space and five levels of offices. It also has four levels of above-ground parking and four basement parking levels. A concurrent planning proposal would change the height and floor space ratio limits that apply to the site. No capital investment or jobs are stated.

The case is at the stage of preparing an environmental impact statement (EIS). The proponent's scoping report is dated 20 Feb 2026 and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been made. Next, the proponent prepares and lodges the EIS, which is then exhibited for public submissions before the department assesses it.

Building height
67 storeysScoping Report 60 Phillip Street Parramatta
Dwellings
371 dwellingsScoping Report 60 Phillip Street Parramatta
Affordable housing share
15%Scoping Report 60 Phillip Street Parramatta
Site area
1,577 m²Scoping Report 60 Phillip Street Parramatta
Office levels
5 levelsScoping Report 60 Phillip Street Parramatta
Basement parking levels
4 levelsScoping Report 60 Phillip Street Parramatta

The department's description

Demolition of all structures onsite, excavation for basement parking and construction of a multi-storey mixed retail, commercial and residential building with aboveground carpark

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.