On the map
State significant development

Nyngan Battery Energy Storage System

A 100 MW battery near East Nyngan Road, Nyngan

Under way: at sears expiredEnergy: batteriesDistrict scale

Where it is in the process

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 100 MW battery near East Nyngan Road, Nyngan

The proponent proposes a battery energy storage system with a capacity of up to 100 MW and up to eight hours of storage, equal to 800 MWh. It would be on rural land about 2 km south of Nyngan town centre in Bogan Shire, and 300 m south of the Nyngan substation. The site is about 46 ha. It would include a substation, inverters and transformers, internal access tracks and a new transmission line to the Nyngan substation about 300 m to the north. No capital investment or job numbers are stated.

The proponent lodged a scoping report, revised on 22 Apr 2024. The Secretary's environmental assessment requirements (SEARs) were issued, and advice came from several agencies. The portal now shows the SEARs as expired. No environmental impact statement is listed and no submissions have been made. The case would need a new request for requirements or an environmental impact statement before it could be exhibited and assessed.

Battery power capacity
100 MWScoping Report
Battery storage capacity
800 MWhScoping Report
Site area
46 haScoping Report

The department's description

Development of a 100 MW / 800 MWh battery energy storage system and associated infrastructure and connection works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Nyngan
Council area
Bogan

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.