NEXTDC S4 Data Centre Phase 2, Horsley Park
A 180 MW data centre at 6 Johnston Crescent, Horsley Park
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 180 MW data centre at 6 Johnston Crescent, Horsley Park
The proponent proposes a data centre, Phase 2 of its S4 development, at 6 Johnston Crescent, Horsley Park, in the Fairfield City area. It would have two data centre buildings, each up to 38.67 m high, with about 35,992 m² of gross floor area. The environmental impact statement (EIS) gives a total power consumption of 180 MW and an estimated development cost of $1,790,818,146. The portal's description gives a maximum of 134.4 MW. The EIS says about 217 full-time jobs would operate it.
The EIS is dated September 2026 and was exhibited, drawing 45 submissions: 43 objecting, 1 supporting and 1 commenting. The case is now at the response to submissions stage, where the proponent answers the issues raised and may amend the project. The department then assesses it and prepares a report, and a decision follows. No decision has been made.
- Estimated development cost
- $1.79bnEnvironmental Impact Statement
- Total power consumption
- 180 MWEnvironmental Impact Statement
- Maximum power consumption in portal description
- 134.4 MWPortal page
- Building EF maximum height
- 38.67 mEnvironmental Impact Statement
- Building G maximum height
- 38.67 mEnvironmental Impact Statement
- Gross floor area
- 35,992 m²Environmental Impact Statement
- Operational jobs
- 217 jobsEnvironmental Impact Statement
- Submissions objecting
- 43 submissionsPortal page
The department's description
Construction and operation of a data centre facility with a maximum power consumption of 134.4 megawatts comprising of two data centre buildings, plant and equipment, diesel storage and associated site infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
45 submissions: 45 from the public
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
64 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation8
- Appendix A - Concept Architectural Design Report
- Appendix B - Preliminary Viewpoint Locations
- Appendix C - Infrastructure Servicing Strategy
- Appendix D - Recycled Water Memo
- Appendix E - Water Technical Memorandum
- Appendix F - Near Neighbour Letter
- Appendix G - ACHAR Methodology and Background Information
- Site Context Map - NEXTDC S4 (Phase 2)
Request for SEARs3
SEARs1
EIS37
- Appendix A - SEARs Compliance Table
- Appendix AA - Greenhouse Gas Assessment
- Appendix B - Statutory Compliance Table
- Appendix BB - Visual Impact Assessment
- Appendix C - Mitigation Measures Table
- Appendix CC - Air Quality Impact Assessment
- Appendix D - Engagement Summary
- Appendix DD - BDAR Waiver
- Appendix E - Architectural Plans
- Appendix EE - Bushfire Protection Assessment
- Appendix F - Landscape Plans
- Appendix FF - Surface and Groundwater Impact Assessment
- Appendix G - Architectural Design Report
- Appendix GG - Consultation Outcomes Report
- Appendix H - Traffic Impact Assessment
- Appendix HH - Social Impact Assessment
- Appendix I - Preliminary Construction Management Plan
- Appendix II - EDC Report - For Exhibition
- Appendix J - Green Travel Plan
- Appendix K - Loading Dock Management Plan
- Appendix L - Geotechnical Investigation
- Appendix M - Access Design Review
- Appendix N - Civil Design Report
- Appendix O - Civil Plans
- Appendix P - Landscape Design Report
- Appendix Q - Preliminary Site Investigation
- Appendix R - Waste Management Plan
- Appendix S - BCA Report
- Appendix T - Noise and Vibration Impact Assessment
- Appendix U - Embodied Emissions Materials Form
- Appendix V - Infrastructure Requirements Report
- Appendix W - Plant and Equipment Systems Report
- Appendix X - ESD Report
- Appendix Y - Hazards and Risk Assessment
- Appendix Z - ACHAR - For Public Exhibition
- Application_20260903235408
- Environmental Impact Statement
Response to Submissions1
Agency Advice13
- Advice on SEARs - Council
- Advice on SEARs - DCCEEW Water
- Advice on SEARs - EPA
- Advice on SEARs - FRNSW
- Advice on SEARs - HNSW ACH
- Advice on SEARs - TfNSW
- DCA Technical Advisory advice SSD-108864209
- EPA Advice - EIS
- FRNSW Advice - EIS
- NEXTDC S4 Data Centre Phase 2, Horsley Park - SSD-108864209
- Sydney Water Advice - EIS
- TfNSW Advice - EIS
- WNSW Advice - EIS
What's near it
Where it is
- Suburb
- Horsley Park
- Council area
- Fairfield
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.