Approved on 24 Dec 2025
What it proposes
AI summary. Written from this project's page and its Signed - SSD Instrument of Consent and Signed - SSD-SSI Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 294 MW data centre at 16 Johnston Crescent, Horsley Park
The project is a data centre campus at 16 Johnston Crescent, Horsley Park, in the Fairfield City and Blacktown council areas. It has two four-storey data centre buildings with a total capacity of 294 MW, and two 330kV transmission lines about 2.6 km long to the TransGrid Sydney West Substation. The department gives an estimated development cost of 3.1 billion and the main site is 8.206 ha. The proponent amended the project after exhibition, cutting five buildings to two.
The environmental impact statement (EIS) was exhibited from 26 Jul 2024 to 22 Aug 2024. The amended application was exhibited from 18 Sep 2025 to 1 Oct 2025. The portal counts 7 submissions: 3 objecting, 1 supporting and 3 commenting. The department found the project approvable, and its Executive Director approved it on 24 Dec 2025, as the Minister's delegate, with conditions. Next, the proponent must meet those conditions, including noise limits, before and during construction.
- Estimated development cost
- $3.1bnSigned - SSD-SSI Assessment Report
- Data centre capacity
- 294 MWSigned - SSD-SSI Assessment Report
- Data centre buildings
- 2 buildingsSigned - SSD-SSI Assessment Report
- Transmission line length
- 2.6 kmSigned - SSD-SSI Assessment Report
- Main site area
- 8.21 haSigned - SSD-SSI Assessment Report
- Gross floor area
- 61,695 m²Signed - SSD-SSI Assessment Report
- Maximum building height
- 38 mPortal page
The department's description
Construction and operation of a data centre comprising of six data centre buildings with a maximum height of 38 m and an operational capacity of 250 MW, including substation, earthworks, car parking, landscaping and ancillary works.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
7 submissions: 5 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
2 changes to the project after its decision, each assessed as a case of its own, newest first.
NEXTDC S4 Horsley Park MOD 2 - Acoustic Barrier AmendmentsSSD-63741210-Mod-2
Increase in height of transformer noise wall and an increase in height and length of HVSB noise wall.
Its 7 documents
7 documents in 3 folders, each on the NSW Planning Portal
Modification Application4
Agency Advice1
Determination2
NEXTDC S4 Modification 1 - Design ModificationsSSD-63741210-Mod-1
Increase to the size of pump house and fire bump buildings, increase in heigh of water tanks, amendments to acoustic walls including new acoustic wall, increase in bulk fuel capacity and minor changes to site landscaping.
Its 21 documents
21 documents in 4 folders, each on the NSW Planning Portal
Modification Application5
Agency Advice6
Additional Information8
Determination2
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
147 documents in 11 folders, each on the NSW Planning Portal
Early Consultation3
Notice of Exhibition2
Request for SEARs1
SEARs2
EIS41
- Appendix A - SEARs Compliance Table
- Appendix AA - Bushfire Protection Assessment
- Appendix B - Statutory Compliance Table
- Appendix BB - Access Review Report
- Appendix C - Mitigation Measures Table
- Appendix CC - Green Travel Plan
- Appendix D - Engagement Summary Table
- Appendix DD - Construction Traffic Management Plan
- Appendix E - Architectural Plans
- Appendix EE - Embodied Emissions Materials Form
- Appendix F - Architectural Design Report
- Appendix FF - BDAR Waiver
- Appendix GG - BDAR Waiver Request
- Appendix H - Survey Plan
- Appendix HH - Preliminary Hazards Analysis
- Appendix I - BCA Compliance Report
- Appendix II - Infrastructure Requirements Report
- Appendix J - Landscape Plans
- Appendix JJ - Wayfinding and Signage Plans
- Appendix K - Landscape Design Report
- Appendix KK - Surface and Groudwater Assessment
- Appendix L - Visual Impact Assessment
- Appendix LL - Engagement Outcomes Report
- Appendix M - Traffic Impact Asssessment
- Appendix MM - Arboricultural Impact Assessment
- Appendix N - ESD Report
- Appendix NN - Salinity and ASS Assessment
- Appendix O - Air Quality Impact Assessment
- Appendix O - Concept Air Quality Report
- Appendix P - Noise and Vibration Assessment
- Appendix Q - Flood Risk Assessment Report
- Appendix R - Civil Engineering Report
- Appendix S - Civil Plans
- Appendix T - Contamination Status Letter
- Appendix U - ACHAR
- Appendix V - Heritage Impact Statement
- Appendix W - Social Impact Assessment
- Appendix X - Backup Power Report
- Appendix Y - Geotechnical Assessment
- Appendix Z - Waste Management Plan
- Environmental Impact Assessment - NEXTDC S4 Data Centre
Response to Submissions6
Agency Advice23
- Amendment - Ausgrid advice
- Amendment - CPHR advice
- Amendment - DCCEEW Water advice
- Amendment - EPA Air Advice
- Amendment - EPA initial advice
- Amendment - FRNSW advice
- Amendment - HNSW ACH advice
- Amendment - Heritage NSW advice
- Amendment - Sydney Water Advice
- Amendment - TfNSW advice
- Amendment - WaterNSW advice
- Amendment RFS advice
- BCS EIS SSD 63741210
- DCCEEW Water_NEXTDC S4 Data Centre Horsley Park - EIS 1
- EIS Letter - 28.08.2024
- EPA advice on NEXTDC S4 Data Centre
- HNSW ACH- EIS - NEXTDC S4 Data Centre Horsley Park
- Letter Out - NextDC S4 DC Horsley Park DPHI - EIS
- NEXTDC S4 Data Centre RFS EIS response
- NSWRFS Advice NEXTDC S4 Horsley Park
- SSD-63741210 - No Comment HMS 6813
- TfNSW Response SYD24-00262-02
- WNSW Response - NEXTDC S4 Data Centre EIS (SSD-63741210)
Amendments51
- ACHAR Addendum Letter
- Air Quality Assessment – External HV Works
- Amended Application_20250903042540
- Amendment Acceptance Letter
- Arboricultural - External HV Works
- Climate Change Risk Assessment
- External HV Plans
- Flood Emergency Response Plan
- Greenhouse Gas Emissions Assessment
- Infrastructure Report - External HV Works
- Loading Dock Management Plan
- NEXTDC RTS and Amendment Report
- Noise Assessment - External HV Works
- Preliminary CTMP - External HV Works
- Response to Submissions Table
- Revised Access Report
- Revised Air Quality Impact Assessment
- Revised Arboricultural Impact Assessment
- Revised Architectural Design Report
- Revised Architectural Plans
- Revised BCA Report
- Revised BDAR Waiver Request
- Revised Backup Power Report
- Revised Bushfire Protection Assessment
- Revised Civil Engineering Report
- Revised Civil Plans
- Revised Contamination Remediation Status Letter
- Revised EDC Cover Letter
- Revised ESD Report
- Revised Embodied Emissions Materials Form
- Revised Engagement Outcomes Report
- Revised Engagement Summary Table
- Revised Flood Risk Assessment
- Revised Geotechnical Assessment
- Revised Green Travel Plan
- Revised Heritage Impact Statement
- Revised Infrastructure Requirements Report
- Revised Landscape Design Report
- Revised Landscape Plans
- Revised Mitigation Measures Table
- Revised Noise and Vibration Impact Assessment
- Revised Preliminary CTMP
- Revised Preliminary Hazards Analysis
- Revised Salinity and Acid Sulfate Assessment
- Revised Social Impact Assessment
- Revised Statutory Compliance Table
- Revised Traffic Impact Assessment
- Revised Visual Impact Assessment
- Revised Waste Management Plan
- Revised Wayfinding and Signage Plans
- Surface Water and Groundwater Assessment
Determination7
Management Plans and Strategies2
Other Documents9
- Approval of Staging Request - HV Transmission
- NEXTDC S4 Dilap Part-1NextDC S4 Horsley Park Road Survey
- NEXTDC S4 Dilap Part-2NextDC S4 Horsley Park Road Survey
- NEXTDC S4 Dilap Part-3NextDC S4 Horsley Park Road Survey
- NEXTDC S4 Dilap Part-4NextDC S4 Horsley Park Road Survey
- NEXTDC S4 Dilap Part-5NextDC S4 Horsley Park Road Survey
- NEXTDC S4 Dilap Part-6NextDC S4 Horsley Park Road Survey
- NEXTDC S4 Dilap Part-7NextDC S4 Horsley Park Road Survey
- NXT S4 - TG Works - DPHI Condition A13.docx
What's near it
Where it is
- Suburb
- Horsley Park
- Council areas
- Fairfield, Blacktown
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.