Newington College Redevelopment (Concept and Stage 1)
Newington College redevelopment, Stanmore, for 368 more students
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Newington College redevelopment, Stanmore, for 368 more students
Newington College proposes a staged redevelopment of its Senior Campus at 200 Stanmore Road, Stanmore, in the Inner West Council area. The concept proposal seeks approval for four building envelopes, including a four storey teaching building on College Lane, changes to Centenary Hall, a rebuilt Concordia building and a pedestrian bridge over Stanmore Road. Stage 1 would redevelop Sevington Courts as two buildings of 3 to 4 storeys with indoor and rooftop courts and a 100-space basement car park. It would take an additional 368 students. The environmental impact statement (EIS) says capital investment would exceed $50 million.
The EIS is dated May 2026. The public made 61 submissions: 45 objecting, 3 supporting and 13 commenting. The case is at the response to submissions stage, where the proponent answers the issues raised and may amend the project. The department then assesses it and decides. Later stages would need their own detailed applications.
- Additional students
- 368 studentsPortal page
- Basement car park
- 100 car spacesEnvironmental Impact Statement
- Capital investment (more than)
- $50MEnvironmental Impact Statement
- Submissions received
- 61 submissionsPortal page
The department's description
Concept proposal for four building envelopes, with detailed Stage 1 works comprising the Sevington Courts development, providing indoor and rooftop courts, basement parking, tree removal and landscaping, accommodating an additional 368 students.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
61 submissions: 59 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
87 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation4
Development Application2
EIS62
- Appendix A SEARs Table
- Appendix AA Transport Impact Assessment
- Appendix B Architectural Plans - Concept - Part 1
- Appendix B Architectural Plans - Concept - Part 2
- Appendix BB Green Travel Plan
- Appendix C Architectural Plans - Stage 1 - Part 1
- Appendix C Architectural Plans - Stage 1 - Part 2
- Appendix CC Preliminary CTPMP
- Appendix D Statutory Compliance Table
- Appendix DD BDAR Waiver
- Appendix E Stakeholder Consultation Summary
- Appendix EE Noise and Vibration Impact Assessment
- Appendix F Mitigation Measures
- Appendix FF Report on Geotechnical Investigation
- Appendix G EDC Report
- Appendix GG Ground and Water Assessment
- Appendix H SDRP Meeting Advice
- Appendix HH Civil Package
- Appendix HH Water Management Plan
- Appendix I Engagement Outcomes Report
- Appendix II Flood Impact and Risk Assessment
- Appendix J Survey Plan
- Appendix JJ Flood Emergency Response Plan
- Appendix K Preliminary Plan of Management
- Appendix KK Preliminary Site Investigation - Part1
- Appendix KK Preliminary Site Investigation - Part2
- Appendix KK Preliminary Site Investigation - Part3
- Appendix L Country-Centred Design Framework
- Appendix LL Remediation Action Plan - Part 1
- Appendix LL Remediation Action Plan - Part 2
- Appendix M Architectural Design Report - Part 1
- Appendix M Architectural Design Report - Part 2
- Appendix M Architectural Design Report - Part 3
- Appendix M Architectural Design Report - Part 4
- Appendix MM Site Audit Interim Advice
- Appendix N Landscape Report
- Appendix NN Hazardous Materials Survey
- Appendix O Landscape Plans - Stage 1
- Appendix OO Aviation Impact Assessment
- Appendix P Landscape Plans - Concept
- Appendix PP Construction Waste Management Plan
- Appendix Q Arboricultural Assessment - Concept
- Appendix QQ Operational Waste Management Plan
- Appendix R Arboricultural Assessment - Stage 1
- Appendix RR ACHAR - Redacted
- Appendix S BCA & Access Statement - Concept
- Appendix SS HARDEM
- Appendix SS Historical Archaeological Assessment
- Appendix T BCA & Access Statement - Stage 1
- Appendix TT Conservation Management Plan
- Appendix U Fire Safety Statement
- Appendix UU Heritage Impact Statement
- Appendix V Environmental Wind Impact
- Appendix VV Social Impact Assessment
- Appendix W Visual Impact Assessment
- Appendix WW Infrastructure Requirements Assessment
- Appendix X ESD Report
- Appendix Y Net Zero Statement
- Appendix Z Embodied Emissions Report - Stage 1
- Application Form
- Environmental Impact Statement
- Letter from Newington College - Student Numbers
Response to Submissions2
What's near it
Where it is
- Suburb
- Stanmore
- Council area
- Inner West
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.