On the map
State significant infrastructure

Mount Piper to Wallerawang Transmission

A new 330 kV transmission line, Mount Piper to Wallerawang

Decided: approved on 16 May 2026TransmissionRegional scale

Where it is in the process

Approved on 16 May 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination16 May 2026 (done)
  9. Approved16 May 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Instrument of Approval on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A new 330 kV transmission line, Mount Piper to Wallerawang

The project is a new 330 kilovolt (kV) transmission line of approximately 8 kilometres between the Mount Piper and Wallerawang substations, about 14 km north-west of Lithgow, in the Lithgow City area. It includes 28 new steel lattice towers and four pole structures, and would affect up to about 55.08 ha of native vegetation. It would need about 150 construction jobs. No capital investment is stated.

The environmental impact assessment was exhibited from 27 Aug 2025 to 24 Sep 2025 and drew 53 submissions: 45 objecting, 5 supporting and 3 commenting. The proponent amended the project after submissions. The department's assessment report of April 2026 found it approvable with conditions, and the Minister approved it on 16 May 2026. Next, the proponent must meet the conditions, with construction proposed to start in late 2026.

Transmission line length
8 kmAssessment Report
Construction jobs
150 jobsAssessment Report
Native vegetation affected
55.08 haAssessment Report
Construction footprint
89.4 haAssessment Report
New steel lattice towers
28 towersAssessment Report
Construction time
20 monthsAssessment Report

The department's description

Development of a new 330kV transmission line between the Mount Piper 330kV/ 500 kV substation and Wallerawang 330kV substation

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

53 submissions: 42 from the public, 10 from organisations and 1 from public authorities

Object45
Support5
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

119 documents in 13 folders, each on the NSW Planning Portal

Notice of Exhibition1
Application1
SEARs22
EIS15
Response to Submissions7
Agency Advice36
Amendments2
Additional Information4
Determination3
Management Plans and Strategies20
Reports2
Notifications3
Other Documents3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.