  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination (current stage)

What it proposes

The department's description

Mount Piper Power Station

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

10 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 7 - Ash DamDA80/10060-Mod-7

Decided: decided

0

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

SEE1

See the document on the Planning Portal

Its page on the Planning Portal

M0D 6 - UpgradesDA80/10060-Mod-6

Decided: decided

Upgrades

Its 2 documents

2 documents in 2 folders, each on the NSW Planning Portal

SEE1

See the document on the Planning Portal

Determination1

See the document on the Planning Portal

Its page on the Planning Portal

Mod 5 - Brinex Flyash bisposalDA80/10060-Mod-5

Decided: decided

Its 2 documents

2 documents in 2 folders, each on the NSW Planning Portal

SEE1

See the document on the Planning Portal

Determination1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 10 - Water Management ChangesDA80/10060-Mod-10

Decided: approved on 11 Jun 2026 by the department (director) · 2 submissions

Increase to capacity of existing Coal Settling Pond, construction and operation of two additional water storage ponds totalling approximately 100 ML, construction of a pollution control structure and additional stabilising agent to stockpiled coal.

Its 29 documents

29 documents in 8 folders, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application6

See the 6 documents on the Planning Portal

Response to Submissions4

See the 4 documents on the Planning Portal

Agency Advice9

See the 9 documents on the Planning Portal

Additional Information4

See the 4 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 9 - Operational Efficiency ImprovementsDA80/10060-Mod-9

Decided: approved on 24 Jun 2025 by the department (director)

Improved operational efficiency and better management of ash and brine.

Its 24 documents

24 documents in 5 folders, each on the NSW Planning Portal

Modification Application3

See the 3 documents on the Planning Portal

Agency Advice9

See the 9 documents on the Planning Portal

Additional Information9

See the 9 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 8 - Water Storage PondDA80/10060-Mod-8

Decided: approved on 24 Jul 2019 by the department (director)

New double-lined, 60 ML pond located immediately adjacent to existing Blowdown Pond B. The new pond will function as a mutli-use storage pond to receive flows from blowdown ponds, coal settling basin, ash repositories & new water treatment plant.

Its 6 documents

6 documents in 4 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Additional Information1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 4 - Obtain EPA Licences & ApprovalsDA80/10060-Mod-4

Decided: approved on 18 Jan 1999 by the department (director)

0

Its page on the Planning Portal

Mod 3 - Additional Brine Storage PondDA80/10060-Mod-3

Decided: approved on 30 Nov 1998 by the department (director)

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

SEE1

See the document on the Planning Portal

Its page on the Planning Portal

Mod 2 - Temporary Storage of Brine WasteDA80/10060-Mod-2

Decided: approved on 21 Jun 1996 by the department (director)

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

Determination1

See the document on the Planning Portal

Its page on the Planning Portal

Mod 1 - Temporary Storage Facility Brine WasteDA80/10060-Mod-1

Decided: approved on 18 Mar 1991 by the department (director)

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

SEE1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

18 documents in 3 folders, each on the NSW Planning Portal

Management Plans and Strategies11

See the 11 documents on the Planning Portal

Reports5

See the 5 documents on the Planning Portal

Other Documents2

See the 2 documents on the Planning Portal

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.