Moolarben Coal Mine
Moolarben Coal Project, a new coal mine near Mudgee
Where it is in the process
Approved on 6 Sep 2007
What it proposes
AI summary. Written from this project's page and its Director-General's Assessment Report.pdf and Project Approval.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Moolarben Coal Project, a new coal mine near Mudgee
The proponent proposed a new coal mine about 40 kilometres northeast of Mudgee, in the Mid-Western Regional Council area. It has three open cut pits, an underground mine, a coal handling and preparation plant, and a rail loop and coal loader. Over 21 years it would extract a coal resource of 127 million tonnes, at up to 12 million tonnes a year of run-of-mine coal. The capital investment is $405 million, with around 320 operational jobs. It would disturb up to 2,100 ha.
The environmental assessment was exhibited from 18 Sep 2006 to 23 Oct 2006 and drew 601 submissions, about 87% of them objecting. An expert panel reviewed subsidence, groundwater and noise. The department recommended approval, and the Minister for Planning approved the project on 6 Sep 2007, subject to conditions. Next, the proponent must meet those conditions, including noise, dust, blasting and water limits.
- Capital investment
- $405MDirector-General's Assessment Report.pdf
- Coal resource
- 127 million tonnesDirector-General's Assessment Report.pdf
- Run-of-mine coal a year
- 12 million tonnes a yearDirector-General's Assessment Report.pdf
- Operational jobs
- 320 jobsDirector-General's Assessment Report.pdf
- Construction jobs
- 220 jobsDirector-General's Assessment Report.pdf
- Project life
- 21 yearsDirector-General's Assessment Report.pdf
- Land disturbed
- 2,100 haDirector-General's Assessment Report.pdf
- Submissions received
- 601 submissionsDirector-General's Assessment Report.pdf
The department's description
Moolarben Coal
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Modifications
16 changes to the project after its decision, each assessed as a case of its own, newest first.
Mod 16 - CWO Transmission LineMP05_0117-Mod-16
Modification to facilitate interactions with the approval SSI 48323210 for EnergyCo's CWO REZ ETL
Its 3 documents
3 documents in 2 folders, each on the NSW Planning Portal
Determination2
Consolidated Consent1
Moolarben Stage 1 MOD 15 - UG4 Ancillary WorksMP05_0117-Mod-15
Ancillary works to support the UG4 mining domain at the Moolarben Coal Complex.
Its 22 documents
22 documents in 6 folders, each on the NSW Planning Portal
Modification Application10
Response to Submissions2
Additional Information3
Recommendation3
Determination3
Consolidated Consent1
Moolarben Coal MOD 14 - Increase Coal ProductionMP05_0117-Mod-14
/
Its 39 documents
39 documents in 6 folders, each on the NSW Planning Portal
Application2
Submissions1
Response to Submissions1
Assessment17
Determination3
Moolarben Coal MOD13 - Coal Processing RatesMP05_0117-Mod-13
/
Its 4 documents
4 documents in 2 folders, each on the NSW Planning Portal
Determination3
Moolarben Coal MOD12 - Undergound Extraction RatesMP05_0117-Mod-12
/
Its 29 documents
29 documents in 4 folders, each on the NSW Planning Portal
Response to Submissions1
Recommendation9
Determination5
Moolarben Coal MOD11 - Design RefinementsMP05_0117-Mod-11
/
Its 15 documents
15 documents in 5 folders, each on the NSW Planning Portal
Application3
Response to Submissions1
Recommendation1
Determination2
Moolarben Coal MOD 10 - Increase Production LimitMP05_0117-Mod-10
/
Its 6 documents
6 documents in 5 folders, each on the NSW Planning Portal
Application1
Submissions1
Recommendation1
Determination2
Moolarben Coal MOD 3 - Additional Coal ProcessingMP05_0117-Mod-3
/
Its 8 documents
8 documents in 4 folders, each on the NSW Planning Portal
Application1
Request for DGRS1
Recommendation3
Determination3
Mod 9 - Additional Coal ExtractionMP05_0117-Mod-9
A modification for additional coal extraction at the Moolarben Coal Mine near Mudgee, approved with conditions on 16 Jun 2014.
Its 32 documents
32 documents in 6 folders, each on the NSW Planning Portal
EA9
- Moolarben Stage 1 MOD 9 - Vol 1 EA Main Report.pdf
- Moolarben Stage 1 MOD 9 - Vol 2 Appendices A-C Part ...
- Moolarben Stage 1 MOD 9 - Vol 2 Appendix D Part 2 of...
- Moolarben Stage 1 MOD 9 - Vol 2 Appendix E Part 3 of...
- Moolarben Stage 1 MOD 9 - Vol 3 Appendix F(A) Part 1...
- Moolarben Stage 1 MOD 9 - Vol 3 Appendix F(B) Part 2...
- Moolarben Stage 1 MOD 9 - Vol 3 Appendix G 3 Part 3 ...
- Moolarben Stage 1 MOD 9 - Vol 4 Appendices H-I Part ...
- Moolarben Stage 1 MOD 9 - Vol 4 Appendices J-L Part ...
Submissions1
Agency Submissions8
Response to Submissions2
Recommendation9
- 1. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 2. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 3. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 4. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 5. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 6. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 7. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 8. Moolarben Stage 1 MOD 9 - Director-General's Repo...
- 9. Moolarben Stage 1 MOD 9 - Recommended Consolidate...
Mod 7 - BorefieldMP05_0117-Mod-7
Its 7 documents
7 documents in 3 folders, each on the NSW Planning Portal
Application1
Determination3
Mod 8 - Coal StockpileMP05_0117-Mod-8
Its 3 documents
3 documents in 1 folder, each on the NSW Planning Portal
Determination3
Mod 6 - Coal Rejects BinMP05_0117-Mod-6
Its 7 documents
7 documents in 3 folders, each on the NSW Planning Portal
Application3
Determination3
Mod 5 - Water Pipeline & Other ChangesMP05_0117-Mod-5
Its 10 documents
10 documents in 4 folders, each on the NSW Planning Portal
Application1
Response to Submissions1
Determination3
Mod 4 - Rail Loop ChangesMP05_0117-Mod-4
Its 3 documents
3 documents in 1 folder, each on the NSW Planning Portal
Determination3
Mod 2 - Preliminary Construction WalkMP05_0117-Mod-2
Its 5 documents
5 documents in 3 folders, each on the NSW Planning Portal
Application1
Determination3
Mod 1 - Infrastructure Area LayoutMP05_0117-Mod-1
Its 6 documents
6 documents in 4 folders, each on the NSW Planning Portal
Application1
Response to Submissions1
Determination3
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
170 documents in 10 folders, each on the NSW Planning Portal
Request for DGRS1
EA28
- APPENDIX 01 DIRECTOR GENERALS REQUIREMENTS.pdf
- APPENDIX 02 NEWSLETTERS.pdf
- APPENDIX 03 AIR QUALITY.pdf
- APPENDIX 03A HEALTH RISK ASSESSMENT.pdf
- APPENDIX 04 NOISE AND BLASTING.pdf
- APPENDIX 05_GROUNDWATER ASSESSMENT.pdf
- APPENDIX 06 SURFACE WATER ASSESSMENT.pdf
- APPENDIX 07 FLOODING.pdf
- APPENDIX 08 SUBSIDENCE.pdf
- APPENDIX 09 SOILS LAND CAPBILITY AND AGRICULTURAL SU...
- APPENDIX 10 GEOCHEMICAL ASSESSMENT.pdf
- APPENDIX 11 FLORA FAUNA AND AQUATIC ECOLOGY.pdf
- APPENDIX 12 ABORIGINAL HERITAGE.pdf
- APPENDIX 13 EUROPEAN HERITAGE.pdf
- APPENDIX 14 SOCIO ECONOMIC.pdf
- APPENDIX 15 TRAFFIC.pdf
- APPENDIX 16 PRELIMINARY HAZARD ANALYSIS.pdf
- APPENDIX 17 VISUAL IMPACT ASSESSMENT.pdf
- SECTION_1_130606.pdf
- SECTION_2_210506.pdf
- SECTION_3_040506.pdf
- SECTION_4_120906.pdf
- SECTION_5_120906.pdf
- SECTION_6_130606.pdf
- SECTION_7_140606.pdf
- SECTION_8_090906.pdf
- SECTION_9_090906.pdf
- TOC AND EXECUTIVE SUMMARY1.pdf
Response to Submissions1
Management Plans and Strategies85
- 1. UG4 LW409-414 EP Main Text (April 2026)
- 10. UG4 LW409-414 BFMP-MWRC (April 2026)
- 11. UG4 LW409-414 BFMP-SCR (April 2026)
- 12. UG4 LW409-414 BFMP-TELSTRA (April 2026)
- 13. UG4 LW409-414 PSMP (April 2026)
- 14. UG4 LW409-414 SMP (June 2026)
- 15. UG4 LW409-414 Monitoring Program (May 2026)
- 16. UG4 LW409-414 Subsidence Report
- 17. UG4 LW409-414 Groundwater Technical Report
- 18. UG4 LW409-414 Surface Water Technical Report
- 19. UG4 LW409-414 Biodiversity Technical Report
- 2. UG4 LW409-414 EP Att 1 (April 2026)
- 20. UG4 LW409-414 ACH Technical Report
- 21. UG4 LW409-414 - Final IEAPM Report - Aug 2025
- 22. UG4 EP LW409 - 414 Supplementary IEAPM Advice - Dec 2025
- 3. UG4 LW409-414 EP Att 2 (April 2026)
- 4. UG4 LW409-414 EP Att 3 (April 2026)
- 5. UG4 LW409-414 EP Att 4 (April 2026)
- 6. UG4 LW409-414 WMP (June 2026)
- 7. UG4 LW409-414 LMP (April 2026)
- 8. UG4 LW409-414 BMP (April 2026)
- 9. UG4 LW409-414 HMP (April 2026)
- Appointment of Experts_25072022_082351
- Appointment of Experts_ACH
- Approval - Heritage Management Plan - Jan 2025
- Approval Letter - Extraction Plan LW 401-408
- Approval of Plan Strategy or Study-Moolarben
- Approval of Plan Strategy or Study_02092020_083057
- Approval of Plan Strategy or Study_03122025_085045
- Approval of Plan Strategy or Study_15122023_040527
- Approval of Plan Strategy or Study_21102020_045233
- Approval of Plan Strategy or Study_21102020_045405
- Approval of Plan Strategy or Study_22102020_042751
- Approval of Site 280 Subsidence Program
- Blast MP V6 For Approval
- Blast Management Plan V8
- Built Features Management Plan_UG4 LW 401-408
- Conditional Approval - UG4 EP - LW409-414 June 26
- Conditional Approval Water Management Plans - April 2026
- Determination_EMPs_UG4 LW 401-408
- Environmental Management Strategy
- Environmental Management Strategy Approval
- Extension Request
- Extension Request Approval
- Extraction Plan LW401-408
- Extraction Plan_UG4 LW 401-408
- Ground Water Management Plan
- Groundwater Management Plan April 2026
- Heritage Management Plan - Jan 2025
- IEAPM Advice- UG4 Longwall 401-408 - April 2022
- Key Contacts_UG4 LW 401-408
- LW401-408 EP Biodiversity Management Plan
- LW401-408 EP Built Features Plan
- LW401-408 EP Heritage Management Plan
- LW401-408 EP Land Management Plan
- LW401-408 EP Subsidence Management Plan
- LW401-408 EP Technical Report - Biodiversity
- LW401-408 EP Technical Report - Groundwater
- LW401-408 EP Technical Report - Heritage
- LW401-408 EP Technical Report - Subsidence
- LW401-408 EP Technical Report - Surface Water
- LW401-408 EP Water Management Plan
- MCO_COR_200814 DPIE Biodiversity MP for Approval_
- MCO_PLN_0028 WMP V6 For Approval
- MCO_PLN_0034 BioMP V5 - Aug20 For Approval_
- MCO_PLN_0036 SWB_V4 For Approval
- MCO_PLN_0037 SWMP V5 For Approval
- MCO_PLN_0038_GWMP_V4 For Approval
- MCO_PLN_0053 Brine MP V2 For Approval
- MCO_STR_0001 EMS_V6 For Approval
- Panel review of Revised Groundwater Report
- Reasons for Approval - Extraction Plan LW401-408
- Revised GW Report UG4 LW401-408
- Site 280 Subsidence Program
- Site Water Balance
- Site Water Balance April 2026
- Subsidence Monitoring Program_UG4 LW 401-408
- Surface Water Management Plan
- Surface Water Management Plan April 2026
- UG4 - Ltr: Surface shear monitoring report
- UG4 - Surface Shear Monitoring
- UG4 LW401-407 End of Panel Report
- Water Management Plan
- Water Management Plan Approval
- Water Management Plan_UG4 LW 401-408
Independent Reviews and Audits6
Other Documents41
- Appointment of Dr Townley - Peer Review GW June 26
- Appointment of Experts_09052024_102741
- Approval Retirement of Credits Extension July 24
- Approval of Plan Strategy or Study_07072020_061420
- Approval of extension
- BSA EOT Determination
- Biodiversity Stewardship Agreement EOT Request
- Condition 35F Letter
- EOT Determination
- End of Panel Report LW401-403
- Extension Request Approval
- Extension Request Letter
- Extension Requests_02052024_025115
- Extension Requests_02122022_062547
- Extension Requests_12122024_073732
- Extension Requests_15112021_062058
- Extension Requests_17022023_061614
- Extension Requests_21022020_081907
- Extension Requests_23032022_101509
- Extension Requests_23082021_075746
- Extension Requests_28052024_102430
- Extension Requests_UG4 Extraction Plan_LW401-LW408
- Extension to Install PZ-A
- Extension to Install PZ-A
- IEAPM Advice UG4 EoP Review Report
- MCO Treated Water Discharge
- MCO_COR_200622 Securing of Offsets
- MCO_COR_221028 DPE - Stage 1 Condition 32 EOT request _2
- MCO_COR_240318 DPHI UG4 Suitably Qualified
- MCO_COR_240524 DPHI Conditions 35E and 35F EOT
- MCO_COR_260915_UG4 LW409-414 EP Valley Closure TARP
- Offset Extension of Time
- Other_03072020_074802
- Other_17052023_060835
- Other_24092026_112820
- Rehabiliation Performance & Completion Criteria
- Response to Panel review of UG4 End Panel Report
- Retirement of Credits Extension July 24
- Security of Biodiversity & Heritage Offset
- UG4 End of Panel - DPHI Letter
- UG4 Residual water take requirements
What's near it
Where it is
- Suburb
- Ulan
- Council area
- Mid-Western Regional
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.