Mixed use development with in-fill affordable housing, 68-80 O'Connell Street Caddens
482 homes in 17 buildings at O'Connell Street, Caddens
Where it is in the process
Approved on 23 Oct 2026
What it proposes
AI summary. Written from this project's page and its Instrument SSD-80875966 and Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
482 homes in 17 buildings at O'Connell Street, Caddens
The project is a mixed-use development at 68-80 O'Connell Street, Caddens, in the Penrith City Council area, on a site of 81,291 m². It has 17 buildings: 11 residential flat buildings, 5 shop top housing buildings and a single storey retail building. The buildings are 5 to 7 storeys and hold 482 apartments, including 79 affordable ones. The proponent estimates 600 construction jobs and 81 operational jobs. No capital investment is stated.
The environmental impact statement (EIS) was exhibited from 4 Nov 2025 to 17 Nov 2025. The portal counts 163 submissions: 155 objecting, 3 supporting and 5 commenting. The proponent responded and amended the project. The department's Deputy Secretary approved it, as the Minister's delegate, on 23 Oct 2026, with conditions. Next, the proponent must meet those conditions before building work begins.
- New dwellings
- 482 dwellingsAssessment Report
- Affordable dwellings
- 79 dwellingsAssessment Report
- Site area
- 81,291 m²Assessment Report
- Gross floor area
- 54,074 m²Assessment Report
- Construction jobs
- 600 jobsAssessment Report
- Operational jobs
- 81 jobsAssessment Report
- Trees to be planted
- 534 treesAssessment Report
- Trees to be removed
- 107 treesAssessment Report
The department's description
Construction of 17 buildings including residential flat buildings, shop top housing buildings, a retail building, and the delivery of new roads, open space, landscaping, and utilities/services works
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
163 submissions: 159 from the public, 2 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
119 documents in 10 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation3
Request for SEARs1
EIS52
- 1 - SEARs Table
- 10 - Visual Impact Assessment
- 11 - Traffic and Parking Assessment
- 12 - Noise & Vibration Impact Assessment
- 13 - Integrated Water Management Plan
- 14 - Geotechnical Assessment
- 15 - Groundwater Seepage Assessment
- 16 - Detailed Site Investigation
- 17 - Arboricultural Impact Assessment
- 18 - Landscape Report
- 19 - Landscape Plans
- 2 - Mitigation Measures Table
- 20 - Ecologically Sustainable Design Assessment
- 21 - BASIX and Nathers
- 22 - BDAR
- 23 - Vegetative Management Plan
- 24 - Construction and Demolition Waste Management Plan
- 25 - Social Impact Assessment
- 26 - Bushfire Protection Assessment
- 27 - Aboriginal Heritage Impact Assessment Report
- 28 - Bus Timetables
- 29 - Pedestrian Wind Assessment
- 3 - Strategic Assessment
- 30 - Civil Engineering Plans
- 31 - Flood Risk Consideration
- 32 - Connecting with Country
- 33 - Economic Impact Assessment
- 34 - CPTED Report
- 36 - Registered Community Housing Provider Letter
- 37 - Original Consent
- 38 - Details of Modification and Draft Changes
- 39 - Fauna Management Plan
- 4 - Statutory Assessment
- 40 - Services and Utilities Report
- 41 - Accessibility Design Review
- 42 - Fire Engineering report
- 43 - Road Safety Audit
- 44 - BCA Report
- 45 - Solar Reflectivity
- 46 - Aviation Report
- 47 - Survey Plan
- 48 - Operational Waste Management Plan
- 49_Embodied Emissions
- 5 - Clause 4.6 Request Height
- 6 - Estimated Cost
- 7 - Engagement Report
- 8 - Architectural Plans Part 1
- 8 - Architectural Plans Part 2
- 8 - Architectural Plans Part 3
- 9 - Design Report
- Application_20251010052119
- Environmental Impact Statement
Response to Submissions16
- Appendix 10 - Civil Plans
- Appendix 11 - OWMP
- Appendix 12 - Grounwater Seepage Analysis
- Appendix 13 - Arboricultural Impact Assessment
- Appendix 14 - Traffic and Parking Assessment
- Appendix 15 - Noise and Vibration Impact Assessment
- Appendix 16 - Landscape Plans
- Appendix 17 - BCA Response Letter
- Appendix 4 - Updated Architectural Plans
- Appendix 5 - Social Impact Statement
- Appendix 6 - Flood Impact Assessment
- Appendix 7 - BDAR
- Appendix 8 - IWMP
- Appendix 9 - Stormwater Plans
- Request RTS Letter
- Submissions Report
Agency Advice15
Additional Information20
- 260804 KEYLAN Caddens Response to RFI FINAL
- Architectural Drawings_Updated
- Attachment 10 - Operational Waste Management Plan
- Attachment 11a - Landscape Plans
- Attachment 11b - Landscape Response to RFI
- Attachment 12 - Updated Stormwater Plans
- Attachment 4 - Geotechnical letter
- Attachment 5a - Updated Flood Impact Assessment
- Attachment 5b - Flood Statement Letter
- Attachment 5c - Supplementary Flood Statement Letter
- Attachment 6a - Swept Path Basement
- Attachment 6b - Swept Path Ramps
- Attachment 6c - Swept Path Road Network
- Attachment 6d - Traffic servicing Letter
- Attachment 7 - Arboricultural Impact Assessment
- Attachment 8 - Civil Plans
- Attachment 8a - Civil Engineering Response
- Attachment 9a - Architectural Plans
- Attachment 9b - Architectural Plans
- Request for Additional Information
Recommendation2
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.