On the map
State significant development

Mixed-use development - 13A-29 Union Street, Ultimo

About 220 homes at 13A-29 Union Street, Ultimo

Under way: at prepare eisHomesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Industry Specific SEARs - SSD-109273992 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

About 220 homes at 13A-29 Union Street, Ultimo

The proponent proposes shop-top housing at 13A-29 Union Street, Ultimo, in the City of Sydney, with non-residential floor area and approximately 220 dwellings. The description says 10% of the housing would be affordable for 15 years. No capital investment, building height or floor area is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) were issued on 23 Mar 2026. They list what the EIS must cover, including built form, overshadowing, transport, noise, flooding and contamination. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions before the department assesses it.

Dwellings
220 dwellingsPortal page
Affordable housing share
10%Portal page

The department's description

Shop-top housing comprising non-residential floor area and approximately 220 dwellings (10% affordable housing for 15 years).

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.