Mixed Use Development 124-142 Beamish St and 16-18 Ninth Avenue Campsie
Mixed-use development at Beamish Street, Campsie
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its HDA Environmental Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Mixed-use development at Beamish Street, Campsie
The proponent proposes a mixed-use development on land at 124-128 and 132-142 Beamish Street and 16-18 Ninth Avenue, Campsie, in the Canterbury-Bankstown council area. The environmental impact statement (EIS) describes a podium with residential towers, landscaped terraces including a rooftop garden, a pocket park and a basement. It also seeks changes to the height and floor space controls. No capital investment, number of dwellings or building height is stated.
The EIS is dated January 2026. Submissions were received on it: 45 in total, 34 objecting, 5 supporting and 6 commenting. The proponent has lodged its response to submissions. Next, the department assesses the project with advice from other agencies, then writes an assessment report and recommendation, and the project is decided. The date of the latest stage is not given.
The department's description
Mixed Use Development
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
45 submissions: 42 from the public, 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
85 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs6
EIS71
- Appendix A - SEARS Table
- Appendix AA - Solar Reflectivity Analysis
- Appendix AB - Pedestrian Wind Study
- Appendix AC - Geotechnical Investigation Report
- Appendix AD - Archaeological Technical Report
- Appendix AE - Aboriginal Heritage Assessment Report
- Appendix AF - Construction Waste Management Plan
- Appendix AG - Infrastructure Delivery Staging Plan
- Appendix AH - Fire Engineering Letter
- Appendix AI - Heritage Impact Statement
- Appendix AJ - Hydroeological Asessment Part 1
- Appendix AJ - Hydroeological Asessment Part 2
- Appendix AK - Detailed Site Investigation Part 1
- Appendix AK - Detailed Site Investigation Part 2
- Appendix AK - Detailed Site Investigation Part 3
- Appendix AL - Connecting with Country Report
- Appendix AM - Section J Report
- Appendix AN - Community Housing Provider Letter
- Appendix AO - Economic Impact Assessment
- Appendix AP - Operational Waste Management Plan
- Appendix AQ - Stormwater Management Report
- Appendix AR - ADG Assessment
- Appendix B - Statutory Compliance Table
- Appendix C - Mitigation Measures
- Appendix D - Engagement Report
- Appendix E - Architectural Plans Part 1
- Appendix E - Architectural Plans Part 2
- Appendix E - Architectural Plans Part 3
- Appendix F - Architectural Design Report Part 1
- Appendix F - Architectural Design Report Part 2
- Appendix G - Urban Design Report Part 1
- Appendix G - Urban Design Report Part 2
- Appendix G - Urban Design Report Part 3
- Appendix G - Urban Design Report Part 4
- Appendix G - Urban Design Report Part 5
- Appendix G - Urban Design Report Part 6
- Appendix G - Urban Design Report Part 7
- Appendix G - Urban Design Report Part 8
- Appendix H - Landscape and Public Domain Plan Part 1
- Appendix H - Landscape and Public Domain Plan Part 2
- Appendix H - Landscape and Public Domain Plan Part 3
- Appendix H - Landscape and Public Domain Plan Part 4
- Appendix H - Landscape and Public Domain Plan Part 5
- Appendix I - Landscape Design Report Part 1
- Appendix I - Landscape Design Report Part 2
- Appendix I - Landscape Design Report Part 3
- Appendix I - Landscape Design Report Part 4
- Appendix I - Landscape Design Report Part 5
- Appendix I - Landscape Design Report Part 6
- Appendix I - Landscape Design Report Part 7
- Appendix I - Landscape Design Report Part 8
- Appendix I - Landscape Design Report Part 9
- Appendix L - Site Survey
- Appendix M - Arboricultural Impact Assessment
- Appendix N - BASIX Certificate
- Appendix N - BASIX Report
- Appendix O - NatHERS Certificate
- Appendix P - ESD Report
- Appendix P - Embodied Emissions Materials Form
- Appendix Q - BDAR Waiver
- Appendix R - BCA Report
- Appendix S - Access Assessment Report
- Appendix T - Visual Impact Assessment
- Appendix U - Flood Desktop Review
- Appendix V - Stormwater Management Plan
- Appendix W - Social Impact Assessment
- Appendix X - CPTED Report
- Appendix Y - Transport and Accessibility Impact Assessment
- Appendix Z - Noise and Vibration Assessment
- Application_20260121050935
- HDA Environmental Assessment Report
Response to Submissions1
Agency Advice4
Additional Information1
What's near it
Where it is
- Suburb
- Campsie
- Council area
- Canterbury-Bankstown
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.