Mixed Use Development 10 London Street and 43 North Parade, Campsie
A 33-storey tower with 156 homes at 10 London Street, Campsie
Where it is in the process
Approved on 25 Sep 2026
What it proposes
AI summary. Written from this project's page and its SSD Assessment Report - SSD-90701958 and SSD Instrument of Consent - SSD-90701958 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 33-storey tower with 156 homes at 10 London Street, Campsie
The project is a 33-storey mixed use building at 10 London Street and 43 North Parade, Campsie, in the Canterbury-Bankstown area. It would replace the existing commercial buildings with two ground floor commercial premises below shop-top housing of 156 apartments, including 18 affordable. The department gives an estimated development cost of $154,550,000, 466 construction jobs and 161 car parking spaces, on a site of 1631.7 m².
The environmental impact statement (EIS) was exhibited from 24 Jun 2026 to 22 Jul 2026. The department received 13 submissions on the portal: 7 objecting, 3 supporting and 3 commenting. The council objected. A director of the department, acting for the Minister, approved the project on 25 Sep 2026, subject to conditions. The proponent must now meet those conditions before building starts.
- Estimated development cost
- $154.6MSSD Assessment Report - SSD-90701958
- Apartments
- 156 dwellingsSSD Assessment Report - SSD-90701958
- Affordable apartments
- 18 dwellingsSSD Assessment Report - SSD-90701958
- Building height
- 33 storeysSSD Assessment Report - SSD-90701958
- Construction jobs
- 466 jobsSSD Assessment Report - SSD-90701958
- Car parking spaces
- 161 car spacesSSD Assessment Report - SSD-90701958
- Site area
- 1,631.7 m²SSD Assessment Report - SSD-90701958
The department's description
Mixed use development comprising shop top housing over commercial premises
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
13 submissions: 11 from the public and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
86 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS56
- Appendix A - SEARS Table
- Appendix AA - Solar Reflectivity Analysis
- Appendix AB - Pedestrian Wind Study (Part 1)
- Appendix AB - Pedestrian Wind Study (Part 2)
- Appendix AC - Geotechnical Investigation Report
- Appendix AD - Archaeological Technical Report
- Appendix AE - ACHAR
- Appendix AF - Construction Waste Management Plan
- Appendix AG - Infrastructure Report
- Appendix AH - Fire Safety Report
- Appendix AI - Heritage Impact Statement Report
- Appendix AJ - Public Domain Plan
- Appendix AK - PSI Addendum Letter
- Appendix AK - Preliminary Site Investigation (Part 1)
- Appendix AK - Preliminary Site Investigation (Part 2)
- Appendix AK - Preliminary Site Investigation (Part 3)
- Appendix AL - Connecting with Country Report
- Appendix AM - Section J Report
- Appendix AN - Community Housing Provider Letter
- Appendix AO - Economic Impact Assessment
- Appendix AP - Operational Waste Management Plan
- Appendix AQ - Stormwater Management Report
- Appendix AR - Embodied Emissions Materials Form
- Appendix B - Statutory Compliance Table
- Appendix C - Mitigation Measures
- Appendix D - Community Engagement Outcomes Report
- Appendix E - ADG Assessment
- Appendix E - Architectural Plans (Part 1)
- Appendix E - Architectural Plans (Part 2)
- Appendix E - Architectural Plans (Part 3)
- Appendix E - Yield Table
- Appendix F - Architectural Design Report (Part 1)
- Appendix F - Architectural Design Report (Part 2)
- Appendix G - Urban Design Report
- Appendix H - Landscape Plans
- Appendix I - Landscape Design Report (Part 1)
- Appendix I - Landscape Design Report (Part 2)
- Appendix I - Landscape Design Report (Part 3)
- Appendix L - Site Survey
- Appendix M - Arboricultural Impact Statement
- Appendix N - BASIX Certificate
- Appendix N - BASIX Report
- Appendix O - NaTHERS Certificate
- Appendix P - Ecological Sustainable Development Report
- Appendix Q - BDAR Waiver
- Appendix R - BCA Assessment Report
- Appendix S - Access Assessment Report
- Appendix T - Visual Impact Assessment (Part 1)
- Appendix T - Visual Impact Assessment (Part 2)
- Appendix U - Flood Assessment Report Waiver
- Appendix V - Stormwater Management Plan
- Appendix W - Social Impact Assessment
- Appendix X - CPTED Assessment
- Appendix Y - Transport and Accessibility Impact Assessment
- Appendix Z - Noise and Vibration Impact Assessment
- HDA Environmental Assessment Report - V2
Response to Submissions16
- Appendix A - Updated Architectural East Elevation
- Appendix A - Updated Architectural Plans
- Appendix B - Detailed Site Investigation
- Appendix C - Traffic Response Letter
- Appendix D - Updated Swept Paths
- Appendix E - Updated Community Housing Provider Letter
- Appendix F - Updated Landscape Ground Floor Plan
- Appendix G - Updated Noise Impact Assessment
- Appendix H - Acoustic Response Letter
- Appendix I - Updated Operational Waste Management Plan
- Appendix J - Updated Public Domain Ground Floor Plan
- Appendix K - Public Domain Response Letter
- Appendix L - Updated Stormwater Plan
- Appendix M - Stormwater Response Letter
- RTS -10- London 43 North Parapde SSD90701958
- Response to Submissions Report
Agency Advice4
Determination7
- SSD Assessment Report - SSD-90701958
- SSD Instrument of Consent - SSD-90701958
- SSD Notice of Decision - SSD-90701958
- SSD-90701958 - Approved Architectural Plans
- SSD-90701958 - Approved Landscape Plans
- SSD-90701958 - Approved Public Domain Ground Floor Plan
- SSD-90701958 - Approved Stormwater Management Plan
What's near it
Where it is
- Suburb
- Campsie
- Council area
- Canterbury-Bankstown
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.