On the map
State significant development

Merino Solar Farm

A 450 MW solar farm and battery at Tirrannaville, Goulburn

Under way: at response to submissionsEnergy: solarDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its EIS - Merino Solar Farm on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 450 MW solar farm and battery at Tirrannaville, Goulburn

The proponent proposes to build, run and later decommission a solar farm with a capacity of 450 MW, plus a battery energy storage system of 450 MW / 1,800 MWh and a grid connection. It would sit on land south of Goulburn airport at Tirrannaville and Gundary, between Braidwood Road, Painters Lane and Windellama Road, in the Goulburn Mulwaree area. No capital investment or job numbers are stated.

The environmental impact statement (EIS), dated November 2025, was exhibited and drew 318 submissions: 188 objecting, 126 supporting and 4 commenting. The case is now at the response to submissions stage, where the proponent answers the issues raised and may amend the project. The department then assesses it, with advice from other agencies, and writes an assessment report before a decision is made.

Solar farm capacity
450 MWPortal page
Battery power capacity
450 MWPortal page
Battery storage capacity
1,800 MWhPortal page
Public submissions
318 submissionsPortal page
Submissions objecting
188 submissionsPortal page
Submissions supporting
126 submissionsPortal page

The department's description

Construction, operation and decommissioning of a solar photovoltaic energy generating facility with a capacity of 450 MW and associated infrastructure, including grid connection and battery energy storage system with a capacity of 450 MW / 1,800 MWh

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

318 submissions: 295 from the public, 22 from organisations and 1 from public authorities

Object188
Support126
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

60 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs7
SEARs1
EIS17
Response to Submissions1
Agency Advice33

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.