Meriden School Aquatic Centre
A two-level basement aquatic centre at Meriden School, Strathfield
Where it is in the process
Approved on 17 Dec 2025
What it proposes
AI summary. Written from this project's page and its Assessment Report and Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A two-level basement aquatic centre at Meriden School, Strathfield
Meriden School proposed a new indoor aquatic centre at its Lingwood Campus, 12-16 Margaret Street, Strathfield, in the Strathfield council area. It has two basement levels, an indoor pool, visitor entrance, seating, staffrooms, amenities and storage. The school would expand onto 12-14 Margaret Street, now a residential flat building, and demolish and remediate the site. The estimated development cost is $34,980,000, with 75 construction jobs. The expanded campus would be about 4912 m².
The environmental impact statement (EIS) was exhibited from 20 May 2025 to 16 Jun 2025 and drew 5 submissions, all comments. The proponent responded on 7 Oct 2025, with minor changes. The department found the impacts acceptable. A director of the department, acting for the Minister, approved it with conditions on 17 Dec 2025. Next, the school must meet those conditions before and during construction.
- Estimated development cost
- $35MAssessment Report
- Construction jobs
- 75 jobsAssessment Report
- Expanded campus site area
- 4,912 m²Assessment Report
- Basement levels
- 2 levelsInstrument of Consent
The department's description
Demolition of existing structures and construction of a new two basement level aquatic centre with associated ancillary structures.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
5 submissions: 2 from the public, 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
66 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS32
- Appendix A SEARs Response Table
- Appendix B Statutory Compliance Table Meriden
- Appendix BB Operational Waste Management Plan
- Appendix C Mitigation Measures
- Appendix CC Hazardous Materials Survey
- Appendix D Engagement Summary
- Appendix DD Electrical Services Infrastructure Report
- Appendix F Architectural Drawings
- Appendix FF Aboriginal Cultural Heritage Report
- Appendix GG Heritage Impact Statement
- Appendix H Survey
- Appendix HH CPTED
- Appendix II Social Impact Assessment
- Appendix J Access Report
- Appendix JJ Engagement Report
- Appendix K Landscape Drawings and Report
- Appendix L Arboriculture Impact Assessment
- Appendix M Tree Protection Zone Plan
- Appendix N ESD
- Appendix O Embodied Emissions Reporting
- Appendix P Net Zero Statement
- Appendix Q Transport and Accessibility Impact Assessment
- Appendix R Construction Traffic Management Plan
- Appendix S Green Travel Plan
- Appendix U Noise and Vibration Impact Assessment
- Appendix V Preliminary Geotechnical Shoring Wall Analyses
- Appendix W Dewatering Management Plan
- Appendix X Stormwater Management Report
- Appendix Y Detailed Site Investigation
- Appendix Z Remediation Action Plan
- Application_20250415045828
- Environmental Impact Statement - Meriden Aquatic Centre
Response to Submissions18
- Appendix A Updated Mitigation Measures
- Appendix B Updated Architectural Plans
- Appendix C Landscape Response
- Appendix D Design Response Report
- Appendix E CPTED Report
- Appendix F Noise and vibration Response letter and Report
- Appendix G BCA Statement
- Appendix H Operational Management Plan
- Appendix I Stormwater Confirmation Letter
- Appendix J Transport response letter & Updated GTP
- Appendix K Heritage Response Statement
- Appendix L Arboriculture Impact Assessment
- Appendix L Arborist Statement
- Appendix M - ESD Statement
- Appendix N Heritage NSW additional information
- Appendix O Access Statement
- Request RtS Letter
- Response to Submissions
Agency Advice4
Management Plans and Strategies2
Reports1
What's near it
Where it is
- Suburb
- Strathfield
- Council area
- Strathfield
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.