On the map
State significant development

Mixed Use Development at 1-9 The Boulevarde and 2-12 Churchill Avenue, Strathfield

285 homes at 1-9 The Boulevarde, Strathfield, with a rezoning

Under way: at sears expiredHomesNeighbourhood scale

Where it is in the process

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Strathfield_Scoping_Report_Final_05.11.25 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

285 homes at 1-9 The Boulevarde, Strathfield, with a rezoning

The proponent proposes a mixed use building at 1-9 The Boulevard and 2-12 Churchill Avenue, Strathfield, in the Strathfield council area, on a site of 1,879 m². The portal describes 285 dwellings, 18 of them affordable, with basement and podium car parking, landscaping and public domain improvements. Shops and commercial space would be on the ground and first floors. It also seeks a concurrent rezoning to raise the height and floor space limits in the Strathfield Local Environmental Plan. The scoping report mentions about 332 dwellings, and the tower's height and form are still being tested. No capital investment is stated.

The case is at the stage where the Secretary's environmental assessment requirements (SEARs) have expired. The proponent lodged a scoping report dated 5 Nov 2025. No submissions have been made. If the proponent goes ahead, it would prepare an environmental impact statement for public exhibition. The Minister or a delegate would then decide.

Dwellings
285 dwellingsPortal page
Affordable units
18 unitsPortal page
Site area
1,879 m²Strathfield_Scoping_Report_Final_05.11.25
Dwellings in the scoping report
332 dwellingsStrathfield_Scoping_Report_Final_05.11.25

The department's description

Construction of a mixed use development comprising a total of 285 dwellings with 18 affordable units, basement and podium car parking, landscaping and public domain improvements. The application includes a concurrent rezoning.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.