AI summary. Written from this project's page and its _Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 28 storey office tower at 39-49 Martin Place, Sydney
The project is a new 28 storey commercial tower, plus rooftop plant, above and joined to the southern entrance of the Martin Place Metro Station at 39-49 Martin Place, Sydney, in the City of Sydney area. It includes office space and retail tenancies, loading partly in the basement, and rooftop signage zones. Bicycle parking and end of trip facilities would be on the neighbouring North Site. No capital investment figure is stated, other than that it is above $30 million.
The environmental impact statement (EIS) was dated 4 Oct 2018. The case drew 10 submissions, all from organisations: 1 objecting and 9 commenting. The proponent then responded to submissions, and the Minister approved the project on 13 Aug 2019. Next, the proponent must meet the consent's conditions, and the approval can later be modified.
- Tower height
- 28 storeys_Environmental Impact Statement
- Minimum capital investment value
- $30M_Environmental Impact Statement
- Submissions
- 10 submissionsPortal page
The department's description
Design, construction and operation of a new 28 storey commercial OSD tower, including office space and retail areas above the southern entrance to the Martin Place Metro Station.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
10 submissions: 10 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
4 changes to the project after its decision, each assessed as a case of its own, newest first.
Martin Place South Site Stage 2 MOD 4 - ColumnsSSD-9326-Mod-4
Martin Place Station Precinct - South Side Stage 2 - Increase balustrade height and a modify columns to level 9.
Its 7 documents
7 documents in 3 folders, each on the NSW Planning Portal
Modification Application3
Determination3
Consolidated Consent1
Martin Place South Site Stage 2 MOD 3 - RoofSSD-9326-Mod-3
Changes to the roof level for access and maintenance equipment and introduction of sliding doors on Level 9 to the terrace.
Its 14 documents
14 documents in 4 folders, each on the NSW Planning Portal
Modification Application4
Additional Information6
Determination3
Consolidated Consent1
Martin Place South Site Stage 2 MOD 2 - HoursSSD-9326-Mod-2
The proposed modification seeks to align the circumstances where out-of-hours construction works may be undertaken with the Metro Station Critical State Significant Infrastructure approval (SSI-7400).
Its 20 documents
20 documents in 7 folders, each on the NSW Planning Portal
Modification Application7
Response to Submissions3
Agency Advice3
Additional Information1
Recommendation2
Determination3
Consolidated Consent1
Martin Place South Site Stage 2 MOD 1 - LayoutSSD-9326-Mod-1
Realignment of part of the eastern facade (toward Elizabeth Street) by 600mm to align it with the site boundary and minor internal design changes
Its 12 documents
12 documents in 5 folders, each on the NSW Planning Portal
Early Consultation2
Preparation of Modification Report1
Modification Application5
Determination3
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
148 documents in 8 folders, each on the NSW Planning Portal
SEARs2
EIS47
- AA_Biodiversity Development Assessment Report Waiver
- A_Design Report, Plans, Schedules_Part1
- A_Design Report, Plans, Schedules_Part2
- A_Design Report, Plans, Schedules_Part3
- A_Design Report, Plans, Schedules_Part4
- A_Design Report, Plans, Schedules_Part5
- BB_Signage Assessment
- B_SEARs
- CC_Compliance with Approval Concept Proposal
- C_Site Survey
- DD_Design Excellence Report
- DD_Design Excellence Report, Appendix 3_Part1
- DD_Design Excellence Report, Appendix 3_Part2
- DD_Design Excellence Report, Appendix 3_Part3
- DD_Design Excellence Report, Appendix 3_Part4
- D_Statement Heritage Impact
- E_Utilities Services Infrastructure Assessment_PART 1
- E_Utilities Services Infrastructure Assessment_PART 2
- E_Utilities Services Infrastructure Assessment_PART 3
- E_Utilities Services Infrastructure Assessment_PART 4
- E_Utilities Services Infrastructure Assessment_PART 5
- E_Utilities Services Infrastructure Assessment_PART 6
- F_Stakeholder and Community Engagement Summary Report
- G_Structural Statement
- H_Stormwater and Flooding Report_Part1
- H_Stormwater and Flooding Report_Part2
- H_Stormwater and Flooding Report_Part3
- I_Rail Corridor Impact Report
- J_Reflectivity Report
- K_Shadow Study
- K_Shadow Study Verification
- L_Wind Tunnel Testing
- M_Transport Reports
- N_Loading Dock Management Plan
- O_Construction Management Plan
- P_Acoustic Assessment
- Q_DDA - Accessibility Statement
- R_Fire Engineering Brief Report
- S_Security Risk Assessment
- T_ESD Report
- U_Waste Management Plan
- V_BCA Report
- W_Visual Impact Assessment
- X_Skyview Factor Assessment
- Y_Air Quality Assessment
- Z_Assessment Airspace Approvability
- _Environmental Impact Statement
Response to Submissions24
- A_South Site Detailed record and RTS table 29_03_19
- B_Design Report, Plans, Compliance
- C_Updated Transport, Construction Management, Loading Dock
- D_Acoustic Assessment
- E_Heritage Interpretation Strategy
- F_Heritage Impact Statement_updated_South Tower
- G_Wind Assessment Addendum Letter 1
- H_Wind Assessment Verification Letter
- H_Wind Assessment Verification Letter 2
- I_Updated Security Risk Assessment + CPTED
- J_Skyview Verification Letter 1
- J_Skyview Verification Letter 2
- K_Visual Impact Verification Letter 1
- K_Visual Impact Verification Letter 2
- L_Retail Activation Strategy
- M_Wayfinding Strategy
- N_ESD Addendum letter
- O_Updated Shadow Study
- P_Fire Engineering Response to FRNSW
- Q_Updated Design Excellence Report
- Q_Updated Design Excellence Report, Appendix 3
- R_Compliance with the approved Concept Proposal (as amended
- S_Sky Signage Strategy
- South Site RTS Report 29_03_19
Determination4
Management Plans and Strategies19
- 201120_South Letter to satisfy B14 and B15
- 202011 MPISD CCS Station and OSD
- 210226_South Letter to satisfy A26_A27_A28
- 210520 Metro Martin Place Precinct Public Art Plan
- ARUP ESD Post Approval Letter South
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study_01042021_084040
- Approval of Plan Strategy or Study_27082021_075815
- Approval of Plan Strategy_12032021_041329
- Att A - HNSW Consultation
- Att B - MPMS HNSW Presentation Meeting Minutes
- Att B – Letter of support from Martin Place DRP
- Att C - Precinct - HIP
- Att D - Submission of HIP to HNSW
- Att E - HNSW MPMS HC Delegation letter
- Att F - HNSW Signing off HIP
- Attachment A – Retail Strategy
- DPE Letter acknowledgment D3 Negotiated OOHW
Other Documents49
- 1. TK422-F03 (r16) Martin Place CSSI CNVMP
- 15879_B5-B7 Discharge Request_Sth
- 18228_r01v09_201123 CTMP (1) (1)
- 2. TK422 F01 Martin Place Towers Add CNVMP (r2)
- 201117_Grimshaw Confirmation of Engagement Letter
- 2101021 MMP Reflectivity certification item B11
- 211130 MMP-S CC2 External Wall System Disclosure
- 3. 20201209 MPUSP CNVMP Rev16 approval
- Approval of Plan Strategy or Study_19052021_011629
- Att A - Comparison of Signage Design
- Attachment A_DRP #12 Presentation Material
- Attachment B_DRP #12 Meeting Minutes
- Attachment C_Drawings (clouded)_1-28
- Attachment C_Drawings (clouded)_29
- Attachment C_Drawings (clouded)_30
- Attachment C_Drawings (clouded)_31
- Attachment C_Drawings (clouded)_32-34
- Attachment D_Drawings (non-clouded)_1-28
- Attachment D_Drawings (non-clouded)_29
- Attachment D_Drawings (non-clouded)_30
- Attachment D_Drawings (non-clouded)_31
- Attachment D_Drawings (non-clouded)_32-34
- B5-B7 2nd request_South_22Sep2020
- Condition B10 - Statement of Compliance
- Condition B16 - Rooftop Signage Installation_24 April 2026
- DIR South Site_21July2020
- DPIE Approval - MPISD EHS Management Plan
- Detailed Design Package
- Discharge of Condition B16_23 Sept 2025
- Fulfilment of Conditions B12 and B13_13Feb2020
- Letter - Condition B10 - Materials and Finishes
- Letter for endorsement of revised DRP Terms of Reference -
- MMP-ISD Project EHS Management Plan Revision 4.6
- MPISD Community Agreement Amendment - FINAL
- Martin Place PA 3 - changes and DRP
- Martin Place South Site - Design Changes
- Metro MP_Con Waste Management Sub-Plan
- Other_02102020_012325
- Other_05042023_021909
- Other_16112021_024148
- Other_17092021_023403
- Other_21052020_032218
- Other_26022020_121142
- PA-46 Signed Letter
- PA-47 Approval of Plan Strategy or Study1601361
- South Site_Condition B14 Extension Letter_6May2020
- South Site_Fufilment of Condition B31_3Sep2021
- South Tower Waste Management Plan
- TZ_CSWSMP-MAC-SMS-AT-MOD-939910A
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.