Martin Place Station Precinct - South Site Stage 2

A 28 storey office tower at 39-49 Martin Place, Sydney

Decided: approved on 13 Aug 2019Commercial and retailNeighbourhood scale

Where it is in the process

Approved on 13 Aug 2019

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination13 Aug 2019 (done)
  9. Approved13 Aug 2019

What it proposes

AI summary. Written from this project's page and its _Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 28 storey office tower at 39-49 Martin Place, Sydney

The project is a new 28 storey commercial tower, plus rooftop plant, above and joined to the southern entrance of the Martin Place Metro Station at 39-49 Martin Place, Sydney, in the City of Sydney area. It includes office space and retail tenancies, loading partly in the basement, and rooftop signage zones. Bicycle parking and end of trip facilities would be on the neighbouring North Site. No capital investment figure is stated, other than that it is above $30 million.

The environmental impact statement (EIS) was dated 4 Oct 2018. The case drew 10 submissions, all from organisations: 1 objecting and 9 commenting. The proponent then responded to submissions, and the Minister approved the project on 13 Aug 2019. Next, the proponent must meet the consent's conditions, and the approval can later be modified.

Tower height
28 storeys_Environmental Impact Statement
Minimum capital investment value
$30M_Environmental Impact Statement
Submissions
10 submissionsPortal page

The department's description

Design, construction and operation of a new 28 storey commercial OSD tower, including office space and retail areas above the southern entrance to the Martin Place Metro Station.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

10 submissions: 10 from organisations

Object1
Support0
Comment9

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

4 changes to the project after its decision, each assessed as a case of its own, newest first.

Martin Place South Site Stage 2 MOD 4 - ColumnsSSD-9326-Mod-4

Decided: approved on 2 Mar 2023 by the department (team leader)

Martin Place Station Precinct - South Side Stage 2 - Increase balustrade height and a modify columns to level 9.

Its 7 documents

7 documents in 3 folders, each on the NSW Planning Portal

Modification Application3

See the 3 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Martin Place South Site Stage 2 MOD 3 - RoofSSD-9326-Mod-3

Decided: approved on 30 Apr 2021 by the department (director)

Changes to the roof level for access and maintenance equipment and introduction of sliding doors on Level 9 to the terrace.

Its 14 documents

14 documents in 4 folders, each on the NSW Planning Portal

Modification Application4

See the 4 documents on the Planning Portal

Additional Information6

See the 6 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Martin Place South Site Stage 2 MOD 2 - HoursSSD-9326-Mod-2

Decided: approved on 16 Dec 2020 by the department (director) · 1 submission

The proposed modification seeks to align the circumstances where out-of-hours construction works may be undertaken with the Metro Station Critical State Significant Infrastructure approval (SSI-7400).

Its 20 documents

20 documents in 7 folders, each on the NSW Planning Portal

Modification Application7

See the 7 documents on the Planning Portal

Response to Submissions3

See the 3 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Additional Information1

See the document on the Planning Portal

Recommendation2

See the 2 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Martin Place South Site Stage 2 MOD 1 - LayoutSSD-9326-Mod-1

Decided: approved on 1 Dec 2020 by the department (director)

Realignment of part of the eastern facade (toward Elizabeth Street) by 600mm to align it with the site boundary and minor internal design changes

Its 12 documents

12 documents in 5 folders, each on the NSW Planning Portal

Early Consultation2

See the 2 documents on the Planning Portal

Preparation of Modification Report1

See the document on the Planning Portal

Modification Application5

See the 5 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

148 documents in 8 folders, each on the NSW Planning Portal

SEARs2
EIS47
Response to Submissions24
Determination4
Management Plans and Strategies19
Reports1
Notifications2
Other Documents49