An 800 MW battery and industry precinct at Kurnell

Under way: at prepare eisEnergy: batteriesRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report_KEIP_FINAL on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An 800 MW battery and industry precinct at Kurnell

The proponent proposes a battery energy storage system of up to 800 MW and 3,800 MWh at the existing Kurnell Terminal, 2 Solander Street, Kurnell, in Sutherland Shire. It would sit in a new Kurnell Energy and Industry Precinct, with a subdivision of vacant land, bulk earthworks and a connection to the Kurnell South Zone Substation. Most of the facility would be no higher than 6 m, apart from lightning masts up to 30 m. The site is about 234 ha. No capital investment is stated.

The scoping report is dated 28 Apr 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). When it is lodged, it is to be exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Battery power capacity
800 MWScoping Report_KEIP_FINAL
Battery storage capacity
3,800 MWhScoping Report_KEIP_FINAL
Site area
234 haScoping Report_KEIP_FINAL
Maximum height of most of the facility
6 mScoping Report_KEIP_FINAL
Maximum lightning mast height
30 mScoping Report_KEIP_FINAL

The department's description

Subdivision of land within the existing Kurnell Terminal for industry and energy uses and development of a 800MW / 3,800MWh Battery Energy Storage System

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.