On the map
State significant development

Koorakee Energy Park

A 2 GW wind, solar and battery energy park near Euston

Under way: at prepare eisEnergy: windRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 2 GW wind, solar and battery energy park near Euston

The proponent proposes the Koorakee Energy Park on Lake Benanee, off the Sturt Highway near Euston, in Balranald Shire. It would have an installed capacity of up to 2 GW: about 167 wind turbines up to 270 m tall for 1 GW, about 3,100 ha of solar panels for 1 GW, and a battery of up to 1 GW with 12 GWh of storage. The scoping report describes a development corridor of about 13,700 ha within a 58,000 ha investigation area. No capital investment is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, with advice from agencies and councils. There are no public submissions yet. Next, the EIS is to be exhibited and the public can make submissions. The proponent then responds, the department assesses the project and a decision follows.

Total installed capacity
2 GWScoping Report
Wind turbines
167 turbinesScoping Report
Turbine tip height
270 mScoping Report
Solar panel area
3,100 haScoping Report
Battery storage capacity
12 GWhScoping Report
Proposed development corridor
13,700 haScoping Report
Project investigation area
58,000 haScoping Report

The department's description

Construction and operation of a 2 gigawatts (GW) energy park, comprising 1 GW solar farm, 1 GW wind farm (including 167 WTGs up to 270 m in height) and a 1 GW/12 GWh BESS.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Euston
Council area
Balranald

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.