Euston Wind Farm

Euston Wind Farm: up to 96 turbines near Euston

Under way: at prepare eisEnergy: windRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Euston Wind Farm: up to 96 turbines near Euston

The proponent proposes a wind farm at 'Gulthul Station', about 7.6 km north of Euston, across the Balranald Shire and Wentworth Shire council areas. The scoping report describes about 96 turbines, each up to 275 m tall, with a capacity of about 700 MW. It also includes a battery of 500 MW and 2,000 MWh. The project site covers about 38,567 ha, with a development corridor of about 3,118 ha. No capital investment is stated.

The scoping report is dated September 2023, and the Secretary's environmental assessment requirements (SEARs) were issued in 2025. The proponent is now preparing an environmental impact statement (EIS). No public submissions have been made yet. Next, the EIS is to be exhibited so the public can make submissions. The proponent then responds, and the department assesses the project.

Wind turbines
96 turbinesScoping Report
Maximum turbine height
275 mScoping Report
Wind farm capacity
700 MWScoping Report
Battery power capacity
500 MWScoping Report
Battery storage capacity
2,000 MWhScoping Report
Project site area
38,567 haScoping Report
Development corridor area
3,118 haScoping Report
Distance north of Euston
7.6 kmScoping Report

The department's description

Construction and operation of a wind farm with up to 96 wind turbines, battery storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Euston
Council areas
Balranald, Wentworth

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.