On the map
State significant development

Jerrara Power Energy from Waste Facility

Withdrawn: withdrawnWaste

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Construction and operation of an energy from waste facility with capacity to thermally treat up to 330,000 tpa of residual municipal solid waste and commercial and industrial waste, including construction of an overhead 66 kilovolt power line.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

4 documents in 3 folders, each on the NSW Planning Portal

Request for SEARs1

See the document on the Planning Portal

Development Application1

See the document on the Planning Portal

Additional Information2

See the 2 documents on the Planning Portal

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.