Integrated Oilseed Processing Plant
Where it is in the process
Approved on 7 Nov 2008
What it proposes
The department's description
Riverina Biodiesel
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Modifications
8 changes to the project after its decision, each assessed as a case of its own, newest first.
MOD 5 - Addition of a Bioenergy PlantMP07_0146-Mod-5
Construction of a bioenergy plant to use processed engineered fuel (PEF) to deliver steam to support the oil extraction process and to supply electricity via a back pressure turbine to the development.
Its 3 documents
3 documents in 2 folders, each on the NSW Planning Portal
Early Consultation1
Modification 3 - Addition of a Blending Tank and Storage TankMP07_0146-Mod-3
Addition of a blending tank and a storage tank to produce blended oil
Oilseed Processing MOD 8 – Increase LimitsMP07_0146-Mod-8
The modification seeks to increase to the overall crushing capacity of the facility from 200,000 tonnes per annum to 300,000 tonnes per annum.
Its 31 documents
31 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Modification Application12
Response to Submissions6
Agency Advice5
Additional Information3
Determination3
Consolidated Consent1
Oilseed Processing MOD 7 - Increased Grain StorageMP07_0146-Mod-7
Modify the approval to: - increase the current on-site grain storage capacity from 27,000 tonnes (t) to 60,000 t - permit up to 58,000 t of grain to be stored in two storage bunkers - use grain stacking equipment to optimise grain deliveries.
Its 21 documents
21 documents in 5 folders, each on the NSW Planning Portal
Modification Application1
Agency Advice7
Additional Information10
Determination2
Consolidated Consent1
Oilseed Processing MOD 1 - Production LimitsMP07_0146-Mod-6
The modification seeks to remove the production limits on vegetable protein meal and refined vegetable oil from condition 6 of the approval and retain the gross processing limit of 200,000 tonnes per annum for oilseed.
Its 11 documents
11 documents in 4 folders, each on the NSW Planning Portal
Modification Application1
Additional Information7
Determination2
Consolidated Consent1
Integrated Oilseed Processing Plant MOD 4 - TankMP07_0146-Mod-4
Addition of a blending tank and a storage tank to produce blended oil
Its 27 documents
27 documents in 3 folders, each on the NSW Planning Portal
Modification Application22
Agency Advice3
Determination2
Mod 2 - Increased Processing LimitsMP07_0146-Mod-2
Its 10 documents
10 documents in 5 folders, each on the NSW Planning Portal
Application2
Agency Submissions4
Response to Submissions1
Determination2
Mod 1MP07_0146-Mod-1
Its 26 documents
26 documents in 6 folders, each on the NSW Planning Portal
Application1
Agency Submissions9
Response to Submissions1
Determination2
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
17 documents in 8 folders, each on the NSW Planning Portal
Application2
Response to Submissions1
Determination4
Management Plans and Strategies4
Independent Reviews and Audits2
What's near it
Where it is
- Suburb
- Bomen
- Council area
- Wagga Wagga
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.