On the map
State significant development

Integrated Oilseed Processing Plant

Decided: approved on 7 Nov 2008Other

Where it is in the process

Approved on 7 Nov 2008

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination7 Nov 2008 (done)
  8. Approved7 Nov 2008

What it proposes

The department's description

Riverina Biodiesel

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

8 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 5 - Addition of a Bioenergy PlantMP07_0146-Mod-5

Withdrawn: withdrawn

Construction of a bioenergy plant to use processed engineered fuel (PEF) to deliver steam to support the oil extraction process and to supply electricity via a back pressure turbine to the development.

Its 3 documents

3 documents in 2 folders, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

SEARs2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Modification 3 - Addition of a Blending Tank and Storage TankMP07_0146-Mod-3

Withdrawn: withdrawn

Addition of a blending tank and a storage tank to produce blended oil

Its page on the Planning Portal

Oilseed Processing MOD 8 – Increase LimitsMP07_0146-Mod-8

Decided: approved on 24 Dec 2025 by the department (director) · 1 submission

The modification seeks to increase to the overall crushing capacity of the facility from 200,000 tonnes per annum to 300,000 tonnes per annum.

Its 31 documents

31 documents in 7 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application12

See the 12 documents on the Planning Portal

Response to Submissions6

See the 6 documents on the Planning Portal

Agency Advice5

See the 5 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Oilseed Processing MOD 7 - Increased Grain StorageMP07_0146-Mod-7

Decided: approved on 4 Sep 2024 by the department (team leader)

Modify the approval to: - increase the current on-site grain storage capacity from 27,000 tonnes (t) to 60,000 t - permit up to 58,000 t of grain to be stored in two storage bunkers - use grain stacking equipment to optimise grain deliveries.

Its 21 documents

21 documents in 5 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice7

See the 7 documents on the Planning Portal

Additional Information10

See the 10 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Oilseed Processing MOD 1 - Production LimitsMP07_0146-Mod-6

Decided: approved on 15 Sep 2023 by the department (team leader)

The modification seeks to remove the production limits on vegetable protein meal and refined vegetable oil from condition 6 of the approval and retain the gross processing limit of 200,000 tonnes per annum for oilseed.

Its 11 documents

11 documents in 4 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Additional Information7

See the 7 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Integrated Oilseed Processing Plant MOD 4 - TankMP07_0146-Mod-4

Decided: approved on 30 Aug 2019 by the department (director)

Addition of a blending tank and a storage tank to produce blended oil

Its 27 documents

27 documents in 3 folders, each on the NSW Planning Portal

Modification Application22

See the 22 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 2 - Increased Processing LimitsMP07_0146-Mod-2

Decided: approved on 11 Nov 2015 by the department (director) · 2 submissions

Its 10 documents

Its page on the Planning Portal

Mod 1MP07_0146-Mod-1

Decided: approved on 28 Apr 2011 by the department (director-general)

Its 26 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.