On the map
Site verification certificate

HVO South Open Cut Coal Continuation Project

Withdrawn: withdrawnMining

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Continuation of mining at the HVO South open cut mining complex until 2045, including mining of deeper coal seams and a reduction in maximum extraction rate (from 20 Mtpa to 18 Mtpa)

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.