Hunter Street - Commercial Tower (East)
A 58 storey commercial tower at Hunter Street East, Sydney
Where it is in the process
Approved on 19 Apr 2024
What it proposes
AI summary. Written from this project's page and its Assessment Report - Hunter Street East and Development Consent - Hunter Street East on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 58 storey commercial tower at Hunter Street East, Sydney
Sydney Metro sought concept approval for a commercial office tower of about 58 storeys above the eastern entrance to the Hunter Street Metro station in the Sydney CBD. The concept sets a building envelope and a maximum gross floor area of 84,223 m², with up to 70 car parking spaces shared with the west site. The department gives a capital investment of $727.5 million, 300 construction jobs and 8,000 operational jobs.
The environmental impact statement (EIS) was exhibited from 5 Dec 2022 to 30 Jan 2023 and drew 7 submissions: 1 objecting and 6 commenting. The proponent responded on 19 Jan 2024. A director of the department, acting for the Minister, approved the concept on 19 Apr 2024, with conditions. Detailed design needs a future development application, which must meet the conditions.
- Capital investment
- $727.5MAssessment Report - Hunter Street East
- Construction jobs
- 300 jobsAssessment Report - Hunter Street East
- Operational jobs
- 8,000 jobsAssessment Report - Hunter Street East
- Tower height
- 58 storeysAssessment Report - Hunter Street East
- Maximum gross floor area
- 84,223 m²Assessment Report - Hunter Street East
- Maximum car parking spaces
- 70 car spacesAssessment Report - Hunter Street East
- Site area
- 3,694 m²Assessment Report - Hunter Street East
The department's description
Concept proposal for the Sydney Metro Hunter Street East site.
For the Hunter Street Metro Planning Proposal go to:
www.cityofsydney.nsw.gov.au/policy-planning-changes/proposed-changes-pl…
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
7 submissions: 2 from the public, 2 from organisations and 3 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Modification 1 to Hunter Street-Commercial Tower (East)SSD-46246713-Mod-1
The application seeks to make minor amendments to the approved Concept building envelope including the reconfiguration of the internal building core and minor changes to the upper podium and tower positioning within the site.
Its 14 documents
14 documents in 2 folders, each on the NSW Planning Portal
Modification Application10
Determination4
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
52 documents in 9 folders, each on the NSW Planning Portal
Early Consultation2
Notice of Exhibition1
Request for SEARs1
EIS31
- Cl 4.6 Request - FSR Appendix J-2
- Cl 4.6 Request - Height Appendix J-1
- Environmental Impact Statement
- Hunter St East – Aboriginal Cultural Heritage Assessment Re
- Hunter St East – Architectural Renders – Appendix F
- Hunter St East – BDAR Waiver – Appendix R
- Hunter St East – Building Envelope Drawings – Appendix G
- Hunter St East – CPTED Report – Appendix L
- Hunter St East – Construction Management Statement – Append
- Hunter St East – Contamination Report – Appendix W
- Hunter St East – Demarcation Plans – Appendix I
- Hunter St East – Design Excellence Strategy – Appendix K
- Hunter St East – Design Report – Appendix E
- Hunter St East – ESD Report – Appendix P
- Hunter St East – Engagement – Appendix C
- Hunter St East – Flooding Assessment – Appendix V
- Hunter St East – Historic Heritage Assessment – Appendix Z
- Hunter St East – Integrated Water Management - Appendix U
- Hunter St East – Mitigation Measures – Appendix D
- Hunter St East – Noise & Vibration Assessment – Appendix S
- Hunter St East – Pedestrian Wind Assessment – Appendix N
- Hunter St East – Reference Scheme Drawings – Appendix H
- Hunter St East – Reflectivity Assessment – Appendix M
- Hunter St East – SEARs Compliance Table – Appendix A
- Hunter St East – Site Survey – Appendix T
- Hunter St East – Social Impact Assessment – Appendix AA
- Hunter St East – Statutory Compliance Table – Appendix B
- Hunter St East – Transport and Access Report – Appendix Q
- Hunter St East – Utilities Assessment - Appendix BB
- Hunter St East – Visual Impact Assessment – Appendix O
- Hunter Street East - WMP - Appendix X
Response to Submissions5
Agency Advice3
Additional Information3
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.