Where it is in the process

Approved on 13 Apr 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination13 Apr 2026 (done)
  9. Approved13 Apr 2026

What it proposes

AI summary. Written from this project's page and its SSD Assessment Report and SSD Instrument of Consent SSD-64738258 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Two warehouses and a logistics estate at Black Hill, Cessnock

The project is a logistics estate at 1134 John Renshaw Drive, Black Hill, in the Cessnock City area, on a 94.5 ha site. It includes remediation of contaminated soil, subdivision into 11 lots, and two warehouses with offices covering 103,970 m² of gross floor area. It also includes a signalised intersection and widening of a 1.8 km section of John Renshaw Drive. The department gives an estimated development cost of $261 million, with up to 566 construction jobs and 409 operational jobs.

The environmental impact statement (EIS) was exhibited from 7 Feb 2025 to 6 Mar 2025. The department received 5 submissions: 1 objecting and 4 commenting. The proponent lodged a submissions report on 13 Oct 2025 and amended the layout to reduce clearing. The department recommended approval, and its A/Director approved the project on 13 Apr 2026, as the Minister's delegate, with conditions. Next, the proponent must meet those conditions, including remediation requirements, before and during construction.

Estimated development cost
$261MSSD Assessment Report
Construction jobs
566 jobsSSD Assessment Report
Operational jobs
409 jobsSSD Assessment Report
Gross floor area
103,970 m²SSD Assessment Report
Site area
94.5 haSSD Assessment Report
Lots in subdivision
11 lotsSSD Assessment Report
Road widening length
1.8 kmSSD Assessment Report
Native forest to be removed
43.88 haSSD Assessment Report

The department's description

Warehouse and distribution centre

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

5 submissions: 2 from the public, 1 from organisations and 2 from public authorities

Object1
Support0
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

107 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs3
EIS50
Response to Submissions16
Agency Advice32
Additional Information1
Determination3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.