On the map
State significant development

Enviroking Liquid Waste Facility

Decided: approved on 1 Aug 2010Waste

Where it is in the process

Approved on 1 Aug 2010

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination1 Aug 2010 (done)
  8. Approved1 Aug 2010

What it proposes

The department's description

Expansion of an existing liquid waste treatment facility to treat up to 20,000 tonnes per annum of liquid food wastes, grease trap arrestor wastes and industrial oily waters.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

Enviroking Liquid Waste MOD 3 - Increased processing and storage, amended plans and extended hoursMP07_0048-Mod-3

Decided: approved on 23 Sep 2026 by the department (director) · 1 submission

Increase the maximum amount of liquid waste to be processed on the site from 20,000 tonnes per annum to 30,000 tonnes per annum.

Its 45 documents

Its page on the Planning Portal

Enviroking Liquid Waste Facility MOD 2 - HoursMP07_0048-Mod-2

Decided: approved on 12 Oct 2020 by the department (director)

Modification to extend the hours of operation.

Its 10 documents

10 documents in 2 folders, each on the NSW Planning Portal

Modification Application8

See the 8 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Enviroking Liquid Waste Facility Mod 1 - Design ChangesMP07_0048-Mod-1

Decided: approved on 11 May 2012 by the department (executive director)

Amendments to the approved site and floor plans.

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.