Greta Rail Facility
Greta Rail Facility on the Great Northern Railway, Greta
Where it is in the process
Approved on 18 Mar 2011
What it proposes
AI summary. Written from this project's page and its Director-General's Report.pdf and Instrument of Approval.pdf on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Greta Rail Facility on the Great Northern Railway, Greta
The project is a rail facility on the Great Northern Railway at Greta, in the Cessnock City Council area. The portal gives no description, and no capital investment, capacity or job numbers are stated. The supporting studies cover traffic, water quality, air, blast and vibration, heritage, bushfire, mine subsidence and social impact.
The proponent lodged an environmental assessment, and the public made submissions on it. The portal's count of submissions is 0, though two public submission files are listed. The proponent responded to submissions with further technical papers and development plan drawings. The department's Director-General approved the project on 18 Mar 2011. Next, the proponent must meet the conditions of the approval.
The portal gives no description.
Modifications
2 changes to the project after its decision, each assessed as a case of its own, newest first.
Greta Rail Facility MOD 2 - Change of building designMP09_0233-Mod-2
Change of building design.
Its 7 documents
7 documents in 4 folders, each on the NSW Planning Portal
Modification Application1
Additional Information2
Determination3
Consolidated Consent1
Mod 1 - Land DescriptionMP09_0233-Mod-1
Its 4 documents
4 documents in 2 folders, each on the NSW Planning Portal
Application2
Determination2
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
89 documents in 6 folders, each on the NSW Planning Portal
Application2
Request for DGRS1
EA67
- 01. Environmental Assessment .pdf
- 02. Appendix A - Flora and Fauna .pdf
- 03. Appendix B - Traffic Impact Assessment.pdf
- 04. Appendix C - Noise Impact Assessment.pdf
- 05. Appendix D - Blast and Vibration Assessment.pdf
- 06. Appendix E - Preliminary Risk Screening.pdf
- 07. Appendix F - Geotechnical Report.pdf
- 08. Appendix G - Geotechnical Investigation Report (...
- 09. Appendix G - Geotechnical Investigation Report (...
- 10. Appendix G -Geotechnical Investigation Report (...
- 11. Appendix H - Bushfire Threat Assessment.pdf
- 12. Appendix I - Aboriginal Cultural Heritage Assess...
- 13. Appendix J - Historical Heritage Assessment.pdf
- 14. Appendix J - Addendum Heritage Report (1 of 3).pdf
- 15. Appendix J - Addendum Heritage Report (2 of 3).pdf
- 16. Appendix J - Addendum Heritage Report (3 of 3).pdf
- 17. Appendix J - Addendum Heritage Report (Appendix ...
- 18. Appendix J - Addendum Heritage Report (Appendix ...
- 19. Appendix J - Addendum Heritage Report (Appendix ...
- 20. Appendix J - Addendum Heritage Report (Appendix ...
- 21. Appendix J - Addendum Heritage Report (Appendix ...
- 22. Appendix J - Addendum Heritage Report (Appendix ...
- 23. Appendix J - Addendum Heritage Report (Appendix ...
- 24. Appendix K - Preliminary Contamination Report.pdf
- 25. Appendix L - Air Impact Assessment.pdf
- 26. Appendix M - Economic Assessment.pdf
- 27. Appendix N - Social Impact Assessment.pdf
- 28. Appendix O - Water Quality Assessment (1 of 4).pdf
- 29. Appendix O - Qater Quality Assessment (2 of 4).pdf
- 30. Appendix O - Water Quality Assessment (3 of 4).pdf
- 31. Appendix O - Water Quality Assessment (4 of 4).pdf
- 32. Appendix P - Visual Impact Assessment.pdf
- 33. Appendix Q - Landscape Masterplan Report.pdf
- 34. Appendix R - Sustainability Statement.pdf
- 35. Appendix S - Mine Subsidence Assessment.pdf
- 36. Drawings Cover Sheet.pdf
- 37. Drawing 1514-AR-000-001.pdf
- 38. Drawing 1514-AR-000-002.pdf
- 39. Drawing 1514-AR-100-001.pdf
- 40. Drawing 1514-AR-100-002.pdf
- 41. Drawing 1514-AR-100-003.pdf
- 42. Drawing 1514-AR-200-001.pdf
- 43. Drawing 1514-AR-200-002.pdf
- 44. Drawing 1514-AR-300-001.pdf
- 45. Drawing 1514-AR-400-001.pdf
- 46. Drawing 1514-AR-500-001.pdf
- 47. Drawing 1514-AR-600-001.pdf
- 48. Drawing 1514-AR-600-002.pdf
- 49. Drawing 1514-AR-700-001.pdf
- 50. Drawing 1514-AR-800-001.pdf
- 51. Drawing 1514-AR-800-002.pdf
- 52. Drawing NB11151-RA-170.PDF
- 53. Drawing NB 11151-RA-201 to 210.PDF
- 54. Drawing NB 11151-RA-211 to 214.PDF
- 55. Drawing NB 11151-RA-401.pdf
- 56. Drawing NB 11151-RA-402.pdf
- 57. Drawing NB 11151-RA-403.pdf
- 58. Drawing NB 11151-AR-001.PDF
- 59. Drawing NB 11151-AR-002.PDF
- 60. Drawing NB 11151-AR-003.PDF
- 61. Drawing NB 11151-AR-004.PDF
- 62. Drawing NB 11151-AR-160.PDF
- 63. Drawing NB 11151-RA-501.PDF
- 64. Drawing NB 11151-RA-502.PDF
- 65. Drawing NB 11151-RA-503.PDF
- 66. Drawing NB 11151-RA-504.PDF
- 67. Document Register.pdf
Response to Submissions15
- 01. Sections 1 to 5.pdf
- 02. Technical Papers 6.1 and 6.2.pdf
- 03. Technical Paper 6.3.pdf
- 04. Technical Papers 6.4 and 6.5.pdf
- 05. Technical Paper 6.6.pdf
- 06. Technical Papers 6.7 and 6.8.pdf
- 07. Technical Paper 6.9.pdf
- 08. Technical Paper 6.10 and Appendix A.pdf
- 09. Development Plan Drawing 1.pdf
- 10. Development Plan Drawing 2.pdf
- 11. Development Plan Drawings 3 to 9.pdf
- 12. Developmet Plans Drawing 10 to 36.pdf
- 13. Development Plan Drawings 37 to 42.pdf
- 14. Heritage Management Policy.pdf
- 15. Heritage Management Standard.pdf
Determination2
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.