On the map
State significant development

Gol Gol Wind Farm

An 840 MW wind farm north of Mildura, Gol Gol

Under way: at prepare eisEnergy: windRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An 840 MW wind farm north of Mildura, Gol Gol

The proponent proposes a wind farm of up to 120 wind turbine generators with an installed capacity of up to about 840 MW, at 664 Arumpo Road, about 10 km north-east of Mildura in Wentworth Shire. Each turbine would have a tip height of about 280 m. The turbines would sit in a development corridor of about 10,500 ha, within a project investigation area of about 48,000 ha on freehold farming land. Underground and overhead powerlines would link them to up to three on-site substations and the Buronga substation. No capital investment or job numbers are stated.

The proponent's scoping report is dated May 2024, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). No submissions have been made yet. Next, the EIS is exhibited for public submissions, the proponent responds, and the department assesses it. A solar farm and a battery nearby would be assessed separately.

Wind farm capacity
840 MWPortal page
Wind turbines
120 turbinesPortal page
Maximum turbine height
280 mPortal page
Development corridor
10,500 haScoping Report
Project investigation area
48,000 haScoping Report

The department's description

Construction and operation of a 840 MW wind farm, including 120 WTGs up to 280 m in height

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.