An 81 MW data centre at 12 Frederick Street, Artarmon

Under way: at prepare eisData centresDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report_Frederick Street Data Centre on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An 81 MW data centre at 12 Frederick Street, Artarmon

The proponent proposes a data centre with a maximum power demand of 81 MW at 12 Frederick Street, in the Willoughby City Council area. It would be a five-storey building with a gross floor area of 16,634 m², with ancillary offices, substations, parking, landscaping and demolition of the existing warehouse and office buildings. The site is 1.82 ha, with a development footprint of about 8,391 m². No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report, dated August 2026, asked for the Secretary's environmental assessment requirements (SEARs), which have been issued. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited so the public can make submissions. The department then assesses the project and decides it.

Maximum power demand
81 MWScoping Report_Frederick Street Data Centre
Gross floor area
16,634 m²Scoping Report_Frederick Street Data Centre
Building height
5 storeysPortal page
Site area
1.82 haScoping Report_Frederick Street Data Centre
Development footprint
8,391 m²Scoping Report_Frederick Street Data Centre

The department's description

Construction and operation of a data centre with a load capacity of 81 MW comprising of one five-storey building, substations, ancillary office space, car parking, landscaping and demolition works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.