Flyers Creek Wind Farm
Where it is in the process
Approved on 14 Mar 2014
What it proposes
The department's description
Construction and operation of a 88-132MW wind farm, with up to 44 turbines and associated infrastructure at Flyers Creek, approximately 20 kilometres south of Orange.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
142 submissions: 142 from the public
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
5 changes to the project after its decision, each assessed as a case of its own, newest first.
MOD 5 - Increase easement corridorMP08_0252-Mod-5
Increase the maximum width of a section of the cleared easement corridor from 45m to 70m and minor realignment of the 132kV power line route.
Its 12 documents
12 documents in 4 folders, each on the NSW Planning Portal
Modification Application1
Additional Information8
Determination2
Consolidated Consent1
Flyers Creek Wind MOD 4 - Transmission & TurbineMP08_0252-Mod-4
The proposed modification involves: - an increase to the wind turbine envelope (including a 10 m increase in tip height); and - inclusion of a 132 kV transmission line and switching station to enable the Project to connect to the electrical grid
Its 32 documents
32 documents in 6 folders, each on the NSW Planning Portal
Application1
Response to Submissions11
Additional Information1
Recommendation3
Determination3
Flyers Creek Wind MOD 3 - Turbine ReductionMP08_0252-Mod-3
The proposed modification involves: - a reduction in the number of turbines from 42 to 38 and removal of associated land; - an alternative alignment for the approved 33 kilovolt (kv) overhead power line; and - minor changes to access tracks and un
Its 6 documents
6 documents in 4 folders, each on the NSW Planning Portal
Application2
Response to Submissions1
Recommendation1
Determination2
Flyers Creek Wind MOD 2 - Flyers Creek WindMP08_0252-Mod-2
The modification proposes: - Amendments to Condition B2(c) - A new condition related to the amendment to Condition B2(c) - Removal of approved transmission line from the wind farm substation to the electricity network from Flyers Creek Wind Farm
Its 11 documents
11 documents in 4 folders, each on the NSW Planning Portal
Application1
Recommendation4
Determination5
Flyers Creek Wind MOD 1 - Flyers Creek WindMP08_0252-Mod-1
The Proponent requests that the time frame permitted for satisfaction of the Deferred Commencement Conditions in Schedule B is amended from 12 months to 24 months. CoC C5(a) will also need to be similarly amended.
Its 3 documents
3 documents in 2 folders, each on the NSW Planning Portal
Application1
Determination2
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
109 documents in 11 folders, each on the NSW Planning Portal
Application8
Response to Submissions6
Recommendation5
Determination2
Management Plans and Strategies30
Independent Reviews and Audits4
Notifications2
Other Documents5
What's near it
Where it is
- Suburb
- Forest Reefs
- Council area
- Blayney
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.