On the map
State significant development

Flyers Creek Wind Farm

Decided: approved on 14 Mar 2014Other

Where it is in the process

Approved on 14 Mar 2014

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination14 Mar 2014 (done)
  8. Approved14 Mar 2014

What it proposes

The department's description

Construction and operation of a 88-132MW wind farm, with up to 44 turbines and associated infrastructure at Flyers Creek, approximately 20 kilometres south of Orange.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

142 submissions: 142 from the public

Object92
Support36
Comment14

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

5 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 5 - Increase easement corridorMP08_0252-Mod-5

Decided: approved on 15 Oct 2021 by the department (director)

Increase the maximum width of a section of the cleared easement corridor from 45m to 70m and minor realignment of the 132kV power line route.

Its 12 documents

12 documents in 4 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Additional Information8

See the 8 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Flyers Creek Wind MOD 4 - Transmission & TurbineMP08_0252-Mod-4

Decided: approved on 22 Aug 2019 by the Independent Planning Commission · 73 submissions

The proposed modification involves: - an increase to the wind turbine envelope (including a 10 m increase in tip height); and - inclusion of a 132 kV transmission line and switching station to enable the Project to connect to the electrical grid

Its 32 documents

Its page on the Planning Portal

Flyers Creek Wind MOD 3 - Turbine ReductionMP08_0252-Mod-3

Decided: approved on 30 Nov 2017 by the department (executive director) · 12 submissions

The proposed modification involves: - a reduction in the number of turbines from 42 to 38 and removal of associated land; - an alternative alignment for the approved 33 kilovolt (kv) overhead power line; and - minor changes to access tracks and un

Its 6 documents

6 documents in 4 folders, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Recommendation1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Flyers Creek Wind MOD 2 - Flyers Creek WindMP08_0252-Mod-2

Decided: approved on 14 Sep 2015 by the department (executive director)

The modification proposes: - Amendments to Condition B2(c) - A new condition related to the amendment to Condition B2(c) - Removal of approved transmission line from the wind farm substation to the electricity network from Flyers Creek Wind Farm

Its 11 documents

Its page on the Planning Portal

Flyers Creek Wind MOD 1 - Flyers Creek WindMP08_0252-Mod-1

Decided: approved on 13 Mar 2015 by the department (executive director)

The Proponent requests that the time frame permitted for satisfaction of the Deferred Commencement Conditions in Schedule B is amended from 12 months to 24 months. CoC C5(a) will also need to be similarly amended.

Its 3 documents

3 documents in 2 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.