Finley Solar Farm

A 170 MW solar farm on Canalla Road, Finley

Decided: approved on 29 Jan 2018Energy: solarDistrict scale

Where it is in the process

Approved on 29 Jan 2018

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination29 Jan 2018 (done)
  8. Approved29 Jan 2018

What it proposes

AI summary. Written from this project's page and its Finley Solar - Conditions of Consent.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 170 MW solar farm on Canalla Road, Finley

The project is a 170 MW solar farm and associated infrastructure at 198 Canalla Road, Finley, in the Berrigan Shire Council area. No capital investment, job numbers or site area are stated. The consent does not allow battery storage on the site.

The environmental impact statement (EIS) was dated 6 Sep 2017, and a response to submissions followed in November 2017. The case drew 7 submissions: 1 supporting and 6 commenting. The department approved it on 29 Jan 2018, with conditions. These limit heavy vehicles to 38 movements a day during construction and 4 a day in operation. They also require a vegetation buffer to screen the panels and a 10 metre defendable space for fire safety. Next, the proponent must prepare the required plans, including traffic and biodiversity plans, before construction starts, and then meet the conditions.

Solar farm capacity
170 MWPortal page
Public submissions
7 submissionsPortal page
Heavy vehicle movements a day in construction
38 movementsFinley Solar - Conditions of Consent.pdf
Heavy vehicle movements a day in operation
4 movementsFinley Solar - Conditions of Consent.pdf
Fire defendable space around the panels
10 mFinley Solar - Conditions of Consent.pdf

The department's description

Development of a 170 MW solar farm and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

7 submissions: 1 from the public and 6 from organisations

Object0
Support1
Comment6

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Finley Solar MOD 1 - Substation UpgradeSSD-8540-MOD-1

Decided: approved on 4 Jun 2018 by the department (director)

Relocating and amending the infrastructure required to connect the project to the transmission network.

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

EA1

See the document on the Planning Portal

Recommendation1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

29 documents in 6 folders, each on the NSW Planning Portal

Request for SEARs2
SEARS1
EIS18
Response to Submissions6
Recommendation1
Determination1