Where it is in the process
Approved on 29 Jan 2018
What it proposes
AI summary. Written from this project's page and its Finley Solar - Conditions of Consent.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 170 MW solar farm on Canalla Road, Finley
The project is a 170 MW solar farm and associated infrastructure at 198 Canalla Road, Finley, in the Berrigan Shire Council area. No capital investment, job numbers or site area are stated. The consent does not allow battery storage on the site.
The environmental impact statement (EIS) was dated 6 Sep 2017, and a response to submissions followed in November 2017. The case drew 7 submissions: 1 supporting and 6 commenting. The department approved it on 29 Jan 2018, with conditions. These limit heavy vehicles to 38 movements a day during construction and 4 a day in operation. They also require a vegetation buffer to screen the panels and a 10 metre defendable space for fire safety. Next, the proponent must prepare the required plans, including traffic and biodiversity plans, before construction starts, and then meet the conditions.
- Solar farm capacity
- 170 MWPortal page
- Public submissions
- 7 submissionsPortal page
- Heavy vehicle movements a day in construction
- 38 movementsFinley Solar - Conditions of Consent.pdf
- Heavy vehicle movements a day in operation
- 4 movementsFinley Solar - Conditions of Consent.pdf
- Fire defendable space around the panels
- 10 mFinley Solar - Conditions of Consent.pdf
The department's description
Development of a 170 MW solar farm and associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
7 submissions: 1 from the public and 6 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Finley Solar MOD 1 - Substation UpgradeSSD-8540-MOD-1
Relocating and amending the infrastructure required to connect the project to the transmission network.
Its 4 documents
4 documents in 3 folders, each on the NSW Planning Portal
Recommendation1
Determination2
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
29 documents in 6 folders, each on the NSW Planning Portal
Request for SEARs2
EIS18
- 01. Finley Solar - EIS - Main Report.pdf
- 02. Finley Solar - EIS - Appendix 1 (SEARs and Agenc...
- 03. Finley Solar - EIS - Appendix 2 (Consultation an...
- 04. Finley Solar - EIS - Appendix 3 (Risk Assessment...
- 06. Finley Solar - EIS - Volume 2 Appendices List.pdf
- 07. Finley Solar - EIS - Appendix 5 (Noise Impact As...
- 08. Finley Solar - EIS - Appendix 6 (Traffic Impact ...
- 09. Finley Solar - EIS - Appendix 7 (Visual Impact A...
- 10. Finley Solar - EIS - Appendix 8 (Surface and Gro...
- 11. Finley Solar - EIS - Appendix 9 (Bushfire Threat...
- 12. Finley Solar - EIS - Appendix 10 (Biodiversity A...
- 13. Finley Solar - EIS - Appendix 11 (Aboriginal and...
- 14. Finley Solar - EIS - Appendix 12 (Waste Manageme...
- 15. Finley Solar - EIS - Statement of Validity.pdf
- 16. Finley Solar - EIS - Appendix 13 (Updated BAR).pdf
- 17. Finley Solar - EIS - Appendix 14 (ACHA Addendum)...
- 18. Finley Solar - Revised Project Layout.pdf
- 19. Finley Solar - EIS - Additional Information (dat...
Response to Submissions6
- 1. Finley Solar - Response to Submissions.pdf
- 2. Finley Solar - Appendix 1 - Revised Project Layou...
- 3. Finley Solar - Appendix 2 - Revised BAR.pdf
- 4. Finley Solar - Appendix 3 - Aboriginal Consultati...
- 5. Finley Solar - Appendix 4 - Correspondence with C...
- 6. Finley Solar - Further Information_ December 2017...
Recommendation1
Determination1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.