Berrigan Battery Energy Storage System
A 400 MW battery at Riverina Highway, Finley
Where it is in the process
At prepare eis
What it proposes
AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 400 MW battery at Riverina Highway, Finley
The proponent proposes a battery energy storage system with a capacity of up to 400 MW and 1,600 MWh at Finley, in Berrigan Shire. It would connect directly to the existing Finley Substation. It would use about 770 shipping-container-style units on an 18 ha site, with an on-site substation, an operations building, firefighting water tanks and an access track of about 725 m. It would sit about 100 m from the existing Finley Solar Farm. No capital investment is stated.
The proponent's scoping report is dated 21 Nov 2024. The Secretary's environmental assessment requirements (SEARs) have been issued and agencies have given advice on them. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made so far. The department then assesses the project before a decision.
- Battery power capacity
- 400 MWScoping Report
- Battery storage capacity
- 1,600 MWhScoping Report
- Battery site area
- 18 haScoping Report
- Battery container units
- 770 unitsScoping Report
- Access track length
- 725 mScoping Report
- Underground grid connection length
- 225 mScoping Report
The department's description
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 400MW/1600MWh and ancillary infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
11 documents in 3 folders, each on the NSW Planning Portal
Request for SEARs1
SEARs2
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.