Berrigan Battery Energy Storage System

A 400 MW battery at Riverina Highway, Finley

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery at Riverina Highway, Finley

The proponent proposes a battery energy storage system with a capacity of up to 400 MW and 1,600 MWh at Finley, in Berrigan Shire. It would connect directly to the existing Finley Substation. It would use about 770 shipping-container-style units on an 18 ha site, with an on-site substation, an operations building, firefighting water tanks and an access track of about 725 m. It would sit about 100 m from the existing Finley Solar Farm. No capital investment is stated.

The proponent's scoping report is dated 21 Nov 2024. The Secretary's environmental assessment requirements (SEARs) have been issued and agencies have given advice on them. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made so far. The department then assesses the project before a decision.

Battery power capacity
400 MWScoping Report
Battery storage capacity
1,600 MWhScoping Report
Battery site area
18 haScoping Report
Battery container units
770 unitsScoping Report
Access track length
725 mScoping Report
Underground grid connection length
225 mScoping Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 400MW/1600MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.