On the map
State significant development

Eviron Quarry/Waste Facility

Decided: approved with conditions on 21 Nov 2012Quarries

Where it is in the process

Approved With Conditions on 21 Nov 2012

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination21 Nov 2012 (done)
  8. Approved With Conditions21 Nov 2012

What it proposes

The department's description

Eviron Quarry/Waste Facility

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

2 changes to the project after its decision, each assessed as a case of its own, newest first.

Eviron Road Quarry Modification 2MP06_0068-Mod-2

Under way: at prepare mod report

Construction of Quirks Quarry Landfill by making use of an existing haulage road to support the construction-stage only of the Landfill. A purpose-built road will then be used to support the operational stage of the landfill.

Its page on the Planning Portal

Modification 1 Minor corrections to offset areaMP06_0068-Mod-1

Decided: approved on 14 Oct 2024 by the department (director)

Correcting the minor administrative error in the consent which stated 6.5 ha instead of 3.5 ha for the biodiversity offset area. There are no changes to the project. Modification would be assessed under 4.55(1) of the EP&A Act.

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.