On the map
State significant development

Kings Forest Stage 1

Decided: approved with conditions on 11 Aug 2013Mixed use

Where it is in the process

Approved With Conditions on 11 Aug 2013

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination11 Aug 2013 (done)
  8. Approved With Conditions11 Aug 2013

What it proposes

The department's description

Kings Forest Stage 1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

18 submissions: 18 from the public

Object10
Support0
Comment8

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

20 changes to the project after its decision, each assessed as a case of its own, newest first.

Modification 9MP08_0194-Mod-9

Withdrawn: withdrawn

Amend Conditions 45A(8) and 50, clarify bond calculations of Condition 45A(8) and delete Condition 45A(7)(a)(v)

Its page on the Planning Portal

Mod 5MP08_0194-Mod-5

Withdrawn: withdrawn · 1 submission

Its 8 documents

8 documents in 2 folders, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

Agency Submissions6

See the 6 documents on the Planning Portal

Its page on the Planning Portal

MOD 19 - Bulk EarthworksMP08_0194-Mod-19

Under way: at response to submissions · 12 submissions

Modify concept approval MP 06_0318 and Project Approval MP 08_0194: • Increase the defined area of earthworks. • Remove limitation to the exposed area. • Introduce performance criteria based on monitoring data.

Its 10 documents

10 documents in 4 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application7

See the 7 documents on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Its page on the Planning Portal

Modification 18 Bulk EarthworksMP08_0194-Mod-18

Withdrawn: withdrawn

Modify concept approval MP06_0318 and project approval MP08_0194: • Increase the defined area of earthworks • Remove limitation to the exposed area • Introduce performance criteria based on monitoring data

Its page on the Planning Portal

Modification 14 Kings Forest Stage 1 – Bulk EarthworksMP08_0194-Mod-14

Withdrawn: withdrawn

Modify Prjct Approval MP 08_0194 conditions A3, A6, 9 (a) 9 (d), 9 (f), 9 (g), 10, 11, 52 & 81 - increase exposed disturbed area limits, allow new ways of stabilising exposed areas, allow rock blending to improve soil quality, and other minor changes

Its 27 documents

27 documents in 3 folders, each on the NSW Planning Portal

Modification Application14

See the 14 documents on the Planning Portal

Agency Advice5

See the 5 documents on the Planning Portal

Additional Information8

See the 8 documents on the Planning Portal

Its page on the Planning Portal

MOD 11 - construction of a zone substationMP08_0194-Mod-11

Withdrawn: withdrawn

Modification of MP08_0194 to allow for the construction of a zone substation

Its page on the Planning Portal

MOD 15 - Split building, allow 24hrs, and other changesMP08_0194-Mod-15

Decided: approved on 27 Feb 2026 by the department (executive director) · 46 submissions

- Split the building into two - Modify internal circulation and landscaping - Increase parking - Allow 24hours operation of service station, and increase hours of food & drink premises - Allow illuminated signage - Delete noise limits conditions

Its 44 documents

44 documents in 7 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application16

See the 16 documents on the Planning Portal

Response to Submissions11

See the 11 documents on the Planning Portal

Agency Advice7

See the 7 documents on the Planning Portal

Additional Information4

See the 4 documents on the Planning Portal

Determination4

See the 4 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 17 - Staged Koala Fencing & Revised Road HierarchyMP08_0194-Mod-17

Decided: approved on 5 Dec 2025 by the department (director)

Staged Koala Fencing and Revised Road Hierarchy

Its 10 documents

10 documents in 4 folders, each on the NSW Planning Portal

Modification Application6

See the 6 documents on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 17 - Staged Koala Fencing & Revised Road HierarchyMP08_0194-Mod-17

Decided: approved on 5 Dec 2025 by the department (director)

Staged Koala Fencing and Revised Road Hierarchy

Its 11 documents

11 documents in 4 folders, each on the NSW Planning Portal

Modification Application6

See the 6 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 16 - Changes to Precinct 5 requirements (perimeter roads)MP08_0194-Mod-16

Decided: approved on 8 Jul 2025 by the department (team leader)

Modify consent conditions relating to perimeter roads to allow 7.5m pavement width, as constructed.

Its 12 documents

12 documents in 5 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice4

See the 4 documents on the Planning Portal

Additional Information4

See the 4 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Modification 12- Contributions ConditionMP08_0194-Mod-12

Decided: approved on 1 Mar 2024 by the department (team leader)

Modification to amend Conditions 154 and 155

Its 30 documents

30 documents in 5 folders, each on the NSW Planning Portal

Modification Application15

See the 15 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information10

See the 10 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Modification 13 - Delete Zone Substation from Precinct 2MP08_0194-Mod-13

Decided: approved on 23 Jun 2023 by the department (team leader)

Modify Terms of Approval A3 and A12 to remove the zone substation in Precinct 2 from the Project Approval.

Its 11 documents

11 documents in 3 folders, each on the NSW Planning Portal

Modification Application7

See the 7 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Mod to Kings Forest Stage 1 PA(MP08_0194) - modification to conditionsMP08_0194-Mod-10

Decided: approved on 8 Oct 2020 by the department (director)

To amend the timing for submission of the landscape plan required under Condition 35 and the environmental management plans required under Conditions 40, 41, 42, 43, 44, 47 and 48

Its 6 documents

6 documents in 4 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Kings Forest (Mod 8)MP08_0194-Mod-8

Decided: approved on 26 Nov 2019 by the department (director)

Proposed deletion of condition 8, and amendments to conditions 14 and 23(6)

Its 16 documents

16 documents in 5 folders, each on the NSW Planning Portal

Modification Application10

See the 10 documents on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Additional Information2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Kings Forest Stage 1 (Mod 4)MP08_0194-Mod-4

Decided: approved on 8 May 2019 by the Independent Planning Commission · 215 submissions

Its 174 documents

Its page on the Planning Portal

Mod 7MP08_0194-Mod-7

Decided: approved on 24 May 2018 by the department (executive director) · 1 submission

Its 14 documents

14 documents in 4 folders, each on the NSW Planning Portal

Application3

See the 3 documents on the Planning Portal

Agency Submissions2

See the 2 documents on the Planning Portal

Response to Submissions3

See the 3 documents on the Planning Portal

Determination6

See the 6 documents on the Planning Portal

Its page on the Planning Portal

Mod 6MP08_0194-Mod-6

Decided: approved on 21 Dec 2017 by the department (director)

Its 17 documents

17 documents in 4 folders, each on the NSW Planning Portal

Application10

See the 10 documents on the Planning Portal

Agency Submissions4

See the 4 documents on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Kings Forest Stage 1 MOD 3 - Service StationMP08_0194-Mod-3

Decided: approved on 18 Apr 2016 by Court

/

Its 76 documents

76 documents in 5 folders, each on the NSW Planning Portal

Application28

See the 28 documents on the Planning Portal

Agency Submissions3

See the 3 documents on the Planning Portal

Response to Submissions7

See the 7 documents on the Planning Portal

Recommendation1

See the document on the Planning Portal

Determination37

See the 37 documents on the Planning Portal

Its page on the Planning Portal

Kings Forest Stage 1 MOD 2 - Various AdminMP08_0194-Mod-2

Decided: approved on 20 Oct 2014 by the Independent Planning Commission · 54 submissions

/

Its 10 documents

10 documents in 5 folders, each on the NSW Planning Portal

Application4

See the 4 documents on the Planning Portal

Agency Submissions1

See the document on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Recommendation2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 1MP08_0194-Mod-1

Decided: approved on 19 May 2014 by the department (director)

Kings Forest Stage 1 (Mod 1)

Its 4 documents

4 documents in 2 folders, each on the NSW Planning Portal

Application3

See the 3 documents on the Planning Portal

Determination1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.