On the map
State significant development

Emu Park Solar Farm

A 350 MW solar farm and battery at Ellangowan, near Casino

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 350 MW solar farm and battery at Ellangowan, near Casino

The proponent proposes to build, operate and later decommission a solar farm of about 350 MW, with a battery energy storage system of about 200 MW / 800 MWh and related infrastructure. The site is on Tatham Ellangowan Road, Ellangowan, in the Richmond Valley Council area, about 22 kilometres south-east of Casino. It would connect to existing 330 kV powerlines. The scoping report gives a preliminary estimated development cost of about $800 million and up to 300 construction personnel.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report is dated 10 Dec 2025, and the Secretary's environmental assessment requirements (SEARs) were issued on 11 Feb 2026. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions, before the department assesses it.

Estimated development cost
$800MScoping Report
Solar farm capacity
350 MWPortal page
Battery power capacity
200 MWPortal page
Battery storage capacity
800 MWhPortal page
Construction personnel
300 jobsScoping Report
Distance south-east of Casino
22 kilometresScoping Report

The department's description

Construction, operation, and decommissioning of a Solar Farm with a capacity of approximately 350 MW, a battery energy storage system (BESS) with a capacity of approximately 200 MW / 800 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.