Eastern Creek Retail Centre Stage 1

Decided: approved on 20 Jul 2018Commercial and retail

Where it is in the process

Approved on 20 Jul 2018

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination20 Jul 2018 (done)
  9. Approved20 Jul 2018

What it proposes

The department's description

Detailed DA for the design and operation of Stage 1 (lot 2) of the Eastern Creek Business Hub

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

6 changes to the project after its decision, each assessed as a case of its own, newest first.

Eastern Creek Retail Centre MOD 6 - Layout ChangesSSD-8588-Mod-6

Decided: approved on 11 Jul 2024 by the department (team leader)

Provision of an internal connection from Stage 1 through to Stage 3 of Eastern Creek Quarter to facilitate integration and permeability between Stages 1 and 3 of Eastern Creek Quarter.

Its 10 documents

10 documents in 4 folders, each on the NSW Planning Portal

Modification Application3

See the 3 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Eastern Creek Retail Centre MOD 5 - Loading HoursSSD-8588-Mod-5

Decided: approved on 6 Apr 2021 by the department (director) · 2 submissions

Modification to extend the hours of operation of the loading dock to 5am - 10pm, 7 days a week.

Its 11 documents

11 documents in 5 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Response to Submissions3

See the 3 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Eastern Creek Retail Centre MOD 4 - Access RoadSSD-8588-Mod-4

Decided: approved on 2 Jul 2020 by the department (director)

Modification seeks to allow vehicles to exit Lot 2 via the roundabout on the internal access road.

Its 16 documents

16 documents in 4 folders, each on the NSW Planning Portal

Modification Application4

See the 4 documents on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Additional Information8

See the 8 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Eastern Creek Retail Centre MOD 3 - Design ChangesSSD-8588-Mod-3

Decided: approved on 29 Nov 2019 by the department (director)

Design refinements including updated solar panel layout, internal tenancy layout changes, provision of car park shade sails and signage content.

Its 20 documents

20 documents in 4 folders, each on the NSW Planning Portal

Modification Application6

See the 6 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information9

See the 9 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Eastern Creek Retail Centre MOD 2 - Carpark LayoutSSD-8588-Mod-2

Decided: approved on 18 Jul 2019 by the department (director) · 14 submissions

The application seeks to modify the development consent to amend the layout of the Lot 2 car park and building envelope, to be consistent with the changes proposed concurrently to the early works approved under Concept Plan (SSD 5175)

Its 30 documents

30 documents in 4 folders, each on the NSW Planning Portal

Modification Application5

See the 5 documents on the Planning Portal

Response to Submissions9

See the 9 documents on the Planning Portal

Additional Information12

See the 12 documents on the Planning Portal

Determination4

See the 4 documents on the Planning Portal

Its page on the Planning Portal

Eastern Creek Retail Centre MOD 1 - Facade ChangesSSD-8588-MOD-1

Decided: approved on 21 Nov 2018 by the department (director)

Modify the approved retail centre, including facade realignment at the southwest corner, changes to plant and services, loading dock, trolley bay, waste and recycle room and reconfigure the internal layout

Its 9 documents

9 documents in 2 folders, each on the NSW Planning Portal

Application7

See the 7 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.