DigiCo SYD1 Data Centre Expansion

DigiCo SYD1 data centre expansion, Harris Street, Ultimo

Decided: approved on 23 Dec 2025Data centresDistrict scale

Where it is in the process

Approved on 23 Dec 2025

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination23 Dec 2025 (done)
  9. Approved23 Dec 2025

What it proposes

AI summary. Written from this project's page and its Signed - SSD Instrument of Consent and Signed - SSD-SSI Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

DigiCo SYD1 data centre expansion, Harris Street, Ultimo

The project expands an existing data centre at 390-422 Harris Street and 273 Pyrmont Street, Ultimo, in the City of Sydney. It adds two levels and turns existing floor space into plant and electrical space. Building height rises by 12 m to a maximum of 54.425 m, and power consumption rises to 120 MW. The estimated development cost is $605.6 million, with up to 80 construction jobs and 45 operational jobs retained.

The environmental impact statement (EIS) was exhibited from 2 May 2025 to 29 May 2025. The portal counts 27 submissions: 23 objecting and 4 commenting. The department's assessment found the project approvable, subject to conditions. An Executive Director of the department, as the Minister's delegate, approved it on 23 Dec 2025. Next, the proponent must meet the conditions, including noise limits and an air quality management plan, before construction and operation.

Estimated development cost
605.6 $ millionSigned - SSD-SSI Assessment Report
Construction jobs
80 jobsSigned - SSD-SSI Assessment Report
Operational jobs retained
45 jobsSigned - SSD-SSI Assessment Report
Maximum building height
54.43 mSigned - SSD-SSI Assessment Report
Increase in building height
12 mSigned - SSD-SSI Assessment Report
Total power consumption
120 MWSigned - SSD-SSI Assessment Report
Site area
1.1 haSigned - SSD-SSI Assessment Report

The department's description

Expansion of existing Data Centre facility including two additional levels and the conversion of existing floor space into plant and electrical space, an increase of building height of 12 m and increase in power consumption of 47.5 MW.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

27 submissions: 22 from the public, 4 from organisations and 1 from public authorities

Object23
Support0
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

DigiCo SYD1 DC Mod 1 Minor Design RefinementsSSD-69637456-Mod-1

Decided: approved on 13 Nov 2026 by the department (team leader)

The proposed modifications incorporate design, structural and building services refinements .

Its 16 documents

16 documents in 3 folders, each on the NSW Planning Portal

Modification Application11

See the 11 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

112 documents in 12 folders, each on the NSW Planning Portal

Early Consultation3
Notice of Exhibition1
Request for SEARs2
SEARs2
EIS47
Response to Submissions22
Agency Advice17
Additional Information8
Determination5
Management Plans and Strategies2
Reports2
Notifications1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.