AI summary. Written from this project's page and its Signed - SSD Instrument of Consent and Signed - SSD-SSI Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
DigiCo SYD1 data centre expansion, Harris Street, Ultimo
The project expands an existing data centre at 390-422 Harris Street and 273 Pyrmont Street, Ultimo, in the City of Sydney. It adds two levels and turns existing floor space into plant and electrical space. Building height rises by 12 m to a maximum of 54.425 m, and power consumption rises to 120 MW. The estimated development cost is $605.6 million, with up to 80 construction jobs and 45 operational jobs retained.
The environmental impact statement (EIS) was exhibited from 2 May 2025 to 29 May 2025. The portal counts 27 submissions: 23 objecting and 4 commenting. The department's assessment found the project approvable, subject to conditions. An Executive Director of the department, as the Minister's delegate, approved it on 23 Dec 2025. Next, the proponent must meet the conditions, including noise limits and an air quality management plan, before construction and operation.
- Estimated development cost
- 605.6 $ millionSigned - SSD-SSI Assessment Report
- Construction jobs
- 80 jobsSigned - SSD-SSI Assessment Report
- Operational jobs retained
- 45 jobsSigned - SSD-SSI Assessment Report
- Maximum building height
- 54.43 mSigned - SSD-SSI Assessment Report
- Increase in building height
- 12 mSigned - SSD-SSI Assessment Report
- Total power consumption
- 120 MWSigned - SSD-SSI Assessment Report
- Site area
- 1.1 haSigned - SSD-SSI Assessment Report
The department's description
Expansion of existing Data Centre facility including two additional levels and the conversion of existing floor space into plant and electrical space, an increase of building height of 12 m and increase in power consumption of 47.5 MW.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
27 submissions: 22 from the public, 4 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
DigiCo SYD1 DC Mod 1 Minor Design RefinementsSSD-69637456-Mod-1
The proposed modifications incorporate design, structural and building services refinements .
Its 16 documents
16 documents in 3 folders, each on the NSW Planning Portal
Modification Application11
Agency Advice3
Determination2
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
112 documents in 12 folders, each on the NSW Planning Portal
Early Consultation3
Notice of Exhibition1
Request for SEARs2
EIS47
- Appendix 1 - SEARs Table
- Appendix 10 - Access Capability Statement
- Appendix 11 – Air Quality Impact Assessment
- Appendix 12 - BCA Capability Statement
- Appendix 13 - BDAR Waiver Request
- Appendix 14 – BDAR Waiver
- Appendix 15 - Connecting with Country Framework
- Appendix 16 - Construction Demolition Waste Management Plan
- Appendix 17 - Construction Traffic Management Plan
- Appendix 18 - Dangerous Goods Report
- Appendix 19 – Ecologically Sustainable Design Report
- Appendix 2 - Statutory Compliance Table
- Appendix 20 - Environmental Wind Impact Report
- Appendix 21- Environmental Wind Tunnel Study
- Appendix 22 - Flood Risk Assessment Report
- Appendix 23 - Geotechnical Desktop Assessment Report
- Appendix 24 - Green Travel Plan
- Appendix 25 - Historical Archaeological Assessment
- Appendix 26 - Landscape Report
- Appendix 27 - NABERS Embodied Emissions Materials Form
- Appendix 28 – Noise and Vibration Impact Assessment
- Appendix 29 - Operational Waste Management Plan - Copy
- Appendix 3 - Mitigation measures
- Appendix 30 - Planning Certificates
- Appendix 31 - Preliminary Public Art Plan
- Appendix 32 - Preliminary Site Investigation Report
- Appendix 33 - Reflectivity Report
- Appendix 34 - RH SEPP Assessment Report
- Appendix 35 - Social Impact Assessment
- Appendix 36 - Solar Access Report
- Appendix 37 - Statement of Heritage Impact
- Appendix 38 - Stormwater Report
- Appendix 39 - Structural Report
- Appendix 4 - Engagement Report
- Appendix 40 - Traffic Impact Assessment
- Appendix 41 – Tree Management Plan
- Appendix 42 - Utility Services Report
- Appendix 43 - Visual Impact Assessment
- Appendix 44 - Tree Survey
- Appendix 5 - DCP Compliance Table
- Appendix 6 - Site Survey
- Appendix 7 - Architectural Plans
- Appendix 8 - Design Report
- Appendix 9 - Aboriginal Cultural Heritage Report (Redacted)
- Application_20250410074228
- Environmental Impact Statement
- Estimated Development Cost
Response to Submissions22
- A1 - Engagement Docs
- A10 - Updated Landscape Plans
- A11 - Updated Design Report
- A12 - Updated Mitigation Measures
- A13 - Submissions Register
- A14 - Acoustic Peer Review
- A15- Proposed Construction Staging
- A16 - Construction Traffic Technical Memo
- A17 - Engineering Response
- A2 - Additional Solar Information
- A3 - Heritage Response Evidence
- A4 - Updated Tree Protection Plan
- A5 - Updated Visual Impact Assessment
- A6 - Updated Architectural Plans_Part1
- A6 - Updated Architectural Plans_Part2
- A6 - Updated Architectural Plans_Part3
- A7 - Updated Noise and Vibration Impact Assessment
- A8 - Air Quality Technical Memo
- A9 - Updated ESD Report
- Final Response to Submissions - 400 Harris Street
- Request RTS Letter
- SSD-69637456 Department's comments on the EIS
Agency Advice17
- Assessment - HNSW ACH Response
- AusGrid Advice on EIS
- CPHR Advice on EIS
- City of Sydney Council Submission on EIS
- EPA Advice on EIS
- FRNSW Advice on EIS
- HNSW ACH Advice on EIS
- HNSW EH Advice on EIS
- RTS - Ausgrid Advice
- RTS - CoS Advice
- RTS - EPA Advice
- RTS - FRNSW Advice
- RTS - Heritage NSW ACH Advice
- RTS - TfNSW Advice
- SWC Advice on EIS
- Sydney Water DA Information Sheet (Feb 2025)
- TfNSW Advice on EIS
Additional Information8
Determination5
Management Plans and Strategies2
Notifications1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.