Deniliquin East Battery Energy Storage System

A 100 MW battery on the Riverina Highway, Deniliquin

Decided: approved on 24 Sep 2026Energy: batteriesDistrict scale

Where it is in the process

Approved on 24 Sep 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination24 Sep 2026 (done)
  9. Approved24 Sep 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Conditions of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 100 MW battery on the Riverina Highway, Deniliquin

The project is a battery energy storage system with a discharge capacity of up to 100 MW and 240 MWh of storage, at 21356 Riverina Highway, about 7 km south-east of Deniliquin in the Edward River Council area. It would connect to the existing Deniliquin substation by a 500 m overhead line. The department gives a capital investment of $118 million, up to 52 construction jobs and 2 operational jobs.

The environmental impact statement (EIS) was exhibited from 13 Jun 2025 to 11 Jul 2025 and drew 72 unique submissions, most of them objections. The proponent amended the project in June 2026 to add a second access point. The department found it approvable subject to conditions, and an Executive Director of the department, acting for the Minister, approved it on 24 Sep 2026. Next, the proponent must meet the conditions, including a voluntary planning agreement with the council, before construction.

Capital investment
$118MAssessment Report
Battery discharge capacity
100 MWAssessment Report
Battery storage capacity
240 MWhAssessment Report
Construction jobs
52 jobsAssessment Report
Operational jobs
2 jobsAssessment Report
Site area
11.97 haAssessment Report
Development footprint
7.54 haAssessment Report
Voluntary planning agreement contribution
$600kAssessment Report

The department's description

Development of a 100 MW battery energy storage facility with associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

75 submissions: 64 from the public and 11 from organisations

Object72
Support1
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

103 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs2
SEARs1
EIS24
Response to Submissions10
Agency Advice45
Amendments7
Additional Information10
Determination3