State significant development

Deniliquin Battery Energy Storage System

A 120 MW battery on Riverina Highway, Deniliquin

Decided: approved on 15 Jan 2026Energy: batteriesDistrict scale

Where it is in the process

Approved on 15 Jan 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination15 Jan 2026 (done)
  9. Approved15 Jan 2026

What it proposes

AI summary. Written from this project's page and its IPC - Instrument of Determination and Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 120 MW battery on Riverina Highway, Deniliquin

The project is a battery energy storage system with a capacity of up to 120 MW and 480 MWh, at 21541 Riverina Highway, about 8 km south-east of Deniliquin in the Edward River Council area. It would connect to the existing Deniliquin substation by underground cable. The estimated development cost is $206 million, with up to 90 construction jobs and 2 operational jobs.

The environmental impact statement (EIS) was exhibited from 31 Jan 2025 to 27 Feb 2025 and drew 70 submissions on the portal: 68 objecting, 1 supporting and 1 commenting. The proponent amended the project and responded to submissions. The department's assessment report of November 2025 found it approvable subject to conditions. The Independent Planning Commission approved it on 15 Jan 2026. Next, the proponent must meet the consent's conditions, including a voluntary planning agreement with the council, before construction.

Estimated development cost
$206MAssessment Report
Battery power capacity
120 MWAssessment Report
Battery storage capacity
480 MWhAssessment Report
Construction jobs
90 jobsAssessment Report
Operational jobs
2 jobsAssessment Report
Development footprint
6.89 haAssessment Report
Site area
9.49 haAssessment Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 120MW/480MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

70 submissions: 61 from the public and 9 from organisations

Object68
Support1
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

80 documents in 9 folders, each on the NSW Planning Portal

Early Consultation3
SEARs1
EIS12
Response to Submissions4
Agency Advice39
Amendments2
Additional Information14
Recommendation4
Determination1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.