Concept Proposal for Mixed Use with Affordable Housing – 45-53 Macleay Street, Potts Point
A 45.5 m mixed-use tower at 45-53 Macleay Street, Potts Point
Where it is in the process
Approved on 18 Dec 2025
What it proposes
AI summary. Written from this project's page and its SSD-79316759 Assessment Report and SSD-79316759 Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 45.5 m mixed-use tower at 45-53 Macleay Street, Potts Point
The proposal is a concept plan for a shop-top housing building at 45-53 Macleay Street, Potts Point, in the City of Sydney. It would replace an existing 12-storey residential building. The envelope allows up to 5,029.05 m² of floor space and a height of 45.5 m, with 15% of floor space as affordable housing. Stage 1 demolition is included. The estimated development cost is $91,550,000, with 160 construction jobs and 13 operational jobs.
The environmental impact statement (EIS) was exhibited from 2 Apr 2025 to 29 Apr 2025. The amendment report was exhibited from 12 Sep 2025 to 25 Sep 2025. The portal lists 198 submissions: 190 objecting, 4 supporting and 4 commenting. The department recommended approval, and its Deputy Secretary, acting for the Minister, approved it on 18 Dec 2025 with conditions. A later development application must seek approval for the detailed design and construction.
- Estimated development cost
- $91.6MSSD-79316759 Assessment Report
- Total gross floor area
- 5,029.05 m²SSD-79316759 Assessment Report
- Maximum building height
- 45.5 mSSD-79316759 Assessment Report
- Affordable housing share of floor area
- 15%SSD-79316759 Assessment Report
- Construction jobs
- 160 jobsSSD-79316759 Assessment Report
- Operational jobs
- 13 jobsSSD-79316759 Assessment Report
- Site area
- 1,289.5 m²SSD-79316759 Assessment Report
The department's description
Concept development application for a mixed-use development comprising residential and ground floor retail and Stage 1 demolition works
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
198 submissions: 187 from the public, 9 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
106 documents in 12 folders, each on the NSW Planning Portal
Notice of Exhibition2
Early Consultation1
Request for SEARs1
EIS33
- Appendix A - SEARs Requirements Table
- Appendix AA- Architectural Plans - Reference Scheme
- Appendix B - Statutory Compliance Table
- Appendix BB - Stormwater Management Plan
- Appendix C - Mitigation Measures
- Appendix CC - Reference Scheme Area Schedule
- Appendix D - Estimated Development Cost Report Summary
- Appendix DD - Engineering Advice on Adaptive Reuse
- Appendix E - Engagement Report
- Appendix F - Design Excellence Strategy
- Appendix G - Concept Envelope Drawings
- Appendix H - Design Report
- Appendix I - Survey Plans
- Appendix J - Visual Impact Assessment
- Appendix K - Traffic Impact Assessment
- Appendix L - Stormwater and Civil Drawings
- Appendix M - Preliminary Site Investigation
- Appendix N - Detailed Site Investigation
- Appendix O - Remedial Action Plan
- Appendix P - Landscape Report
- Appendix Q - Arboricultural Impact Assessment
- Appendix R - Ecologically Sustainable Development Report
- Appendix S - BDAR Waiver Request and Waiver
- Appendix T - Waste Management Plan
- Appendix U - Social Impact Assessment
- Appendix V - Flood Impact and Risk Assessment
- Appendix W - Aboriginal Cultural Heritage Assessment Report
- Appendix X - Heritage Impact Statement
- Appendix Y - Preliminary Arch Assessment
- Appendix Z - Community Housing Provider Letter
- Application_20250228063415
- Environmental Impact Statement
- Environmental Impact Statement - Summary
Response to Submissions16
- Appendix A - Detailed Response to Submissions Tables
- Appendix A - Submissions Register
- Appendix B - Updated Demolition Work Plan
- Appendix B - Updated Mitigation Measures
- Appendix C - Amended Envelope Plans
- Appendix D - Solar and Cross Ventilation Analysis
- Appendix E - Supplementary Design Report
- Appendix F - Wind Assessment Report
- Appendix G - Historical Archaeological Impact Assessment
- Appendix H - HARDEM
- Appendix I - Updated ACHAR
- Appendix J - Visual Impact Response Letter
- RFI Letter
- Request RTS Letter - Macleay Street Potts Point
- Response to Submissions Report
- Secondary Response to Submissions Letter
Agency Advice19
- Additional Info - City of Sydney
- Additional Info - DCCEEW Water
- Additional Info - Heritage NSW
- Amendment Report - CPHR
- Amendment Report - City of Sydney
- Amendment Report - DCCEEW Water
- Amendment Report - Heritage NSW
- Amendment Report - Heritage NSW (ACH)
- Amendment Report - Sydney Water
- Amendment Report - TfNSW
- EIS Exhibition - Ausgrid
- EIS Exhibition - CPHR
- EIS Exhibition - DCCEEW Water Group
- EIS Exhibition - Heritage NSW (Aboriginal Cultural Heritage)
- EIS Exhibition - Heritage NSW (Heritage Council)
- EIS Exhibition - TfNSW
- RtS - City of Sydney
- RtS - DCCEEW Water Group
- RtS - Heritage NSW
Amendments12
- Amended Application_20250908224201
- Amendment Macleay Street
- Amendment Report
- Appendix A - Demolition Plan
- Appendix B - Updated Mitigation Measures
- Appendix C - Demolition Work Plan
- Appendix D - Noise and Vibration Management Plan
- Appendix E - Demolition Traffic Management Plan
- Appendix F - Demolition Waste Management Plan
- Appendix G - Erosion and Sediment Control Plan
- Appendix H - Arborist Report
- Demolition Site Plan
Additional Information13
- Additional Information - Addendum SIA Letter
- Additional Information - Dwelling Typology
- Additional Information - Visual Response
- Appendix A - Detailed RFI Response
- Appendix A - Response to DPHI RFI
- Appendix B - Amended Architectural Plans
- Appendix B - Revised Architectural Plans
- Appendix C - ARDEM
- Appendix C - Visual Impact Assessment Response letter
- Appendix D - Groundwater Assessment
- Appendix E - Additional Eye of the Sun Diagrams
- Response to Request for Information - August 2025
- Response to Request for Information - September 2025
Determination4
Notifications1
What's near it
Where it is
- Suburb
- Potts Point
- Council area
- Sydney
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.